Applications tied to the site
Partial coverage27 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
27 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 754 decisions within 5 km, 27 exact-site or onsite candidate records, and 58 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
27 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
27 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
58 structured nearby appeal records.
58 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A change of use from commercial back to a residential dwelling. This together with a new private amenity garden new fencing and all associated site development works
7.2m² single storey extension to rear
Tables & chairs outside the restaurant
Café tables
Proposed removal of shop window and replacement with standard domestic window to front of building located in a heritage area and associated works
Scaffolding
The brief summarizes the pattern across all 754 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460824The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief