Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
27% of nearby decided applications were refused. The site check found 62 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Chun Talmhalochta & Mara agus gach obairlaithreáin ag teastáil a thogáil. Spás urláir comhlán na n-oibreacha beartaithe: 120.5 sqm
To construct a new vehicular site entrance and access road to service existing house as well as all ancillary site works.
Le haghaidh síneadh agus athruithe ar scoil reatha agus ar sheirbhísí gaolmhara. Spás urláir comhlán na n-oibreacha beartaithe: 91.1 sqm
For the construction of a dwelling house, domestic garage, installation of wastewater treatment plant and associated services. Gross floor space of proposed works: N.A.
(1) partial demolish of existing cottage,(2) demolish existing flat roof rear extension (3) construct new sunroom,(4) construct new extensions to the front and rear of existing cottage (5)construct additional first floor area (construct a new effluent treatment system. 189.8 sqm.Gross floor space of proposed works
For a dwelling, garage, wastewater treatment system, and all associated services. Gross floor space of proposed works: 242 sqm (Dwelling - 162 Sqm, Garage - 80 sqm)
The brief summarizes the pattern across all 62 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25137The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief