Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 655 decisions within 5 km, 1 exact-site or onsite candidate record, and 46 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
46 structured nearby appeal records.
46 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) Retention of 11.83sq.m extension to existing kitchen/dining area (2) Retention of external lobby with stairs to Loft Area over bedroom (on Permission 03/572 Granted 25-06-2003) (3) Retention of 2 no. Sheds 54.88sq.mand 12.1 sq.m and all associated works and services
For the construction of the following; (i) single storey creche (467sq.m.) to include 4no. classrooms, W.C.’s, sleep room, staff room, central kitchen, reception, office, store, an associated outdoor play area (2,724sq.m.), building mounted signage (1.8sq.m.), boundary treatments, 67 no. car parking spaces (inclusive of 6 no. accessible parking spaces) and set down area, covered bicycle stands and outdoor bin storage, (ii) 1 no. 140m x 80m all weather GAA pitch, 6 no. 18m high training lights and poles, all fencing and ball stop netting, 2m wide hard standing looped walkway around the perimeter of pitch and covered bicycle stands (iii) 1no. single storey male and female changing room building (108sq.m.), (iv) bespoke park (9,766sq.m.) to include soft and hard landscaping area, outdoor seating area (179sq.m), playground area (775sq.m), ecology garden (477sq.m), butterfly garden (479sq.m), sensory garden (718sq.m), sensory play area (335sq.m.), (v) coach car park (763sq.m.) to facilitate 2no. 52 seater coaches and 2no. mini coaches and all associated drainage connection works and site development works including ESB substation and switch room, foul and surface water drainage, landscaping, path lighting and boundary treatments, all at
Sunroom extension to side of existing house and associated site development works
The construction of the following; (i) 96 no. Individual Housing units for the Elderly consisting of 2 bedroom semi-detached single storey bungalows, open space to include proposed wheelchair accessible ecology garden (249sq.m), proposed wheelchair accessible butterfly garden (329sq.m), proposed wheelchair accessible sensory garden (329sq.m), proposed outdoor seating area (134sq.m) (ii) single storey creche (468sq.m.) to include 4no. classrooms, W.C.’s, sleep room, staff room, central kitchen, reception, office, store, an associated outdoor play area (1,030sq.m.), wheelchair accessible sensory play area (304.6sq.m.), building mounted signage (1.8sq.m.), boundary treatments, 30 no. car parking spaces (inclusive of 3 no. accessible parking spaces) and set down area, covered bicycle stands and outdoor bin storage, (iii) 1 no. 5 aside football pitch 36.5m x 27.5m, 6 no. 18m high training lights and poles, all fencing and ball stop netting, 2m wide hard standing looped walkway around the perimeter of pitch, coach set down, 15no. car parking spaces and covered bicycle stands (iv) single storey administration building (63.8sq.m.) to include 2no. offices and W.C. and all associated drainage connection works and site development works including ESB substation and switch room, foul pumping station, foul and surface water drainage, landscaping, path lighting and boundary treatments, all at
For existing out-buildings, including agricultural storage sheds and stables, on the north west corner of the overall site and all ancillary site works
For an amendment to previously granted permission No. 20/236 which will consist of an amendment to the roof finish material and all associated ancillary landscaping and site development works
The brief summarizes the pattern across all 655 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25190The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief