Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 997 decisions within 5 km, 8 exact-site or onsite candidate records, and 77 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
77 structured nearby appeal records.
77 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) Retain 12 no. single storey, 2 person, prefabricated accommodation cabin, in revised location and all associated sites works carried out to facilitate the foregoing development (further to Planning Reg; Ref 24/352), (2) Planning Permission to erect a Bat Roost (as per condition No. 6 of Planning Reg; Ref 24/352).
(1) ERECT 12 NO. SINGLE STOREY, 2 PERSON, PREFABRICATED ACCOMMODATION CABINS (2) CARRY OUT ALL ASSOCIATED SITE WORKS TO FACILITATE THE PROPOSED DEVELOPMENT
(1) CONSTRUCT A STAND-ALONE MARRIAGE CEREMONY BUILDING AND CARRY OUT ALL ASSOCIATED SITE WORKS TO FACILITATE THE PROPOSED DEVELOPMENT
CONSTRUCT AN INTEGRATED CONSTRUCTED WETLAND (ICW) FOR THE SECONDARY AND TERTIARY TREATMENT OF POST-BALANCING TANK WASTEWATER AND ALL ASSOCIATED WORKS.THE ICW WILL INCLUDE FOUR TREATMENT CELLS, CONNECTING PIPEWORK AND A DISCHARGE TO THE RIVER LEE AT THE SOUTH WEST CORNER OF THE SITE. THE PLANNING APPLICATION IS ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS)
(1) DEMOLISH EXISTING SPA PLANT ROOM, (2) CONSTRUCT AN EXTENSION TO THE HOTEL SPA, COMPRISING NEW SAUNA, STEAM ROOM AND SALT ROOM, EXTENDED RELAXATION ROOM, NEW PREPARATION ROOM, LAUNDRY AND PLANT ROOMS, (3) CONSTRUCT ALL ASSOCIATED INTERNAL CIRCULATION AND ANCILLARY SPACES TO SERVE THE WORKS, (4) CONSTRUCT AN ENCLOSED EXTERNAL COURTYARD CONTAINING A NEW HOT-TUB/PLUNGE-POOL AND A COVERED SEAWEED BATHS ENCLOSURE AND ALL ASSOCIATED ANCILLARTY FACILITIES, (5) CARRY OUT ALL ASSOCIATED SITE WORKS TO FACILITATE THE PROPOSED DEVELOPMENT
CONSTRUCT A STAND-ALONE MARRIAGE CEREMONY BUILDING AND CARRY OUT ALL ASSOCIATED SITE WORKS TO FACILITATE THE PROPOSED DEVELOPMENT
The brief summarizes the pattern across all 997 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25287The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief