Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Ballard Road , Miltown Malbay , Co. ClareOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Ballard Road , Miltown Malbay , Co. Clare

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

7% of nearby decided applications were refused. The site check found 284 decisions within 5 km, 5 exact-site or onsite candidate records, and 16 structured appeals.

Matched source
25301
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

5 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

16 structured nearby appeal records.

16 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

284Nearby applications
5Site-linked candidates
7%Nearby refused
16Structured appeals

Top refusal reasons nearby

Visual Amenity1

Nearest planning decisions

25301

For a new building comprising of areas for car show room, photo booth, customer area and all associated and ancillary site works

Granted0.0 km13 April 2026
2611

Of the auxiliary parking area and entrance from the existing site area, the subject of planning permission ref 25/301 and all other associated site and ancillary works

Granted0.1 km09 March 2026
2560206

Of the changes made to the building as granted under P03/1267. The retention changes include the following a) increase in floor area b) windows and doors omitted / added and their finishes c) the increase in roof height d) projections omitted / added. RETENTION permission is also sought for the outbuildings and canopy areas. PERMISSION is being sought to add a new extension along with ancillary site works

Granted0.1 km13 June 2025
2560610

Of the rear shed building along with ancillary site works

Granted0.1 km20 November 2025
211275

The development consists of a private garage and associated site works

Granted0.1 km26 January 2022
198012

Proposes to carry out the following development. The construction of a new housing estate development consisting of: a) 27 no. residential units comprising of: 8 no. 3-bedroom houses, two-storey semi-detached, i.e. Type A. 2 no. 4 bedroom houses, two-storey semi-detached, i.e. Type B. 1 no. 2 bedroom house, single-storey detached bungalow, i.e. Type C. 12 no. 2-bedroom apartments, two-storey terraced, i.e. Type D. 4 no. 2-bedroom apartments, two-storey semi-detached, i.e. Type E. b) Demolition of existing dweling house. c) 46 ancillary car parking spaces within the development. d) The construction of vehicular and pedestrian access points to the site. e) Pedestrian link to the adjoining Ballard Road housing estate. f) On-site sewage treatment with connection to main sewer. g) Alterations to ground levels to accommodate the development. h) Varied boundary treatments and landscaping works. i) Surface water management will include attenuation and overflow. j) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environment Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development.

Granted0.2 km16 December 2019

The brief summarizes the pattern across all 284 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required