Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 195 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For constructing 8 No. dwellings consisting of 2 No. detached 2-storey houses and 2 No. 2-storey terrace blocks consisting of 3 No. houses each. The development also consists of individual domestic vehicular entrances off Abbeyfield and Mill Lane, new shared cycle / footpath along Mill Lane, connection to foul water sewer, and all associated ancillary site-works. Revised by Significant Further Information which consists of: The principal amendments to the original scheme entail 1) revised site layout including revised access arrangements; 2) revised building designs; 3) revised landscaping and boundary treatments; and 4) revised location of cycle path
For constructing 8 No. semi-detached 2-storey houses. The development also consists of a new recessed vehicular entrance off Abby’s Row and a new recessed vehicular entrance off Cockpit Lane, new internal road network connecting Abby’s Row and Cockpit Lane, connection to foul water sewer, and all associated ancillary site-works. Revised by Significant Further Information which consists of: A revised site layout consisting of 2 no 4 bed Detached two-storey dwellings, 4 no 3-bed semi-detached two-storey dwellings, 2 no 2 bed semi-detached two-storey dwellings, revised landscaping plans, submission of an Architectural Heritage Impact Assessment, Ecological Impact Assessment, tree and hedge survey, revised Part V submission and a Road Safety Audit. The development also consists of a new recessed vehicular entrance off Abby's Row and a new recessed vehicular exit to Cockpit Lane, new internal road network connecting Abby's Row and Cockpit Lane, connection to foul water sewer, and all associated ancillary site-works
Permission for change of use of existing vacant unit (previously granted under planning reference 06/1679 as a coffee shop with offices at first floor level) to residential three bedroom townhouse, refurbishment of existing windows, doors and lime render finish and all associated site works. the building is a protected structure and is recorded in the national inventory of architectural heritage, reg. number 11822001 and rps number is b36-45, the development is located in an architectural conservation area (aca)
For the construction of 2 no. single storey semi-detached dwellings, connection to existing foul water sewer, and all associated ancillary site-works
Planning permission sought for bungalow, domestic garage, connection to all services, new entrance through existing estate and ancillary works
For constructing 29 dwellings consisting of 8 no. apartments in 2 No. 2-storey blocks, 8 No. terraced houses in 2 No. 2-storey terrace blocks, 10 No. semi-detached 2-storey houses, and 3 No. detached houses. The development also consists of a new recessed vehicular entrance, provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment and mid-terrace units, connection to foul water sewer, new footpath connecting to existing footpath and all associated ancillary site-works
The brief summarizes the pattern across all 195 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560639The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief