Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 521 decisions within 5 km, 2 exact-site or onsite candidate records, and 23 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
23 structured nearby appeal records.
23 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a running track with ancillary track facilities, changing rooms, enlarged parking area, floodlighting and associated site works
To Extend the Appropriate Period of Planning Permission Ref:P14/782 to construct dressingroom facilities, car parking, boundary fencing, entrance, floodlighting, to service proposed all weather facilities incorporating 400 metres running track, all weather training facilities and all associated site works
To construct an extension to the rear of the existing dwelling house along with ancillary site works
To raise of the existing site level. Installation of a synthetic all weather training pitch. Erection of 3 no. 10m high flood lighting columns. 2.4m high fence with gates accessing the pitch. 3.6m high ball stop netting above the level of the pitch fencing. Relocating of existing localised foul and storm line and installation of underground drainage
To Extend the Appropriate Period of Planning Permission for P15/279 to construct phase 2 of the Clubhouse, including ancillary works
For alterations and extensions to existing dwelling house, together with all ancillary site development works and services
The brief summarizes the pattern across all 521 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560735The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief