Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 327 decisions within 5 km, 1 exact-site or onsite candidate record, and 22 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
22 structured nearby appeal records.
22 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
(a) retain existing dwelling as-built, (b) Retention permission to retain existing garden shed and (c) Permission to erect a new garage
(A) RETAIN THE DWELLING HOUSE AS CONSTRUCTED (B) RETAIN EXTERNAL STORE 1, EXTERNAL STORE 2, EXTERNAL STORE 3 & THE GREENHOUSE AS CONSTRUCTED (C) RETAIN THE SITE ENTRANCE AS CONSTRUCTED AND (D) RETAIN THE HOUSE, OUT BUILDINGS, DRIVEWAYS AND SITE ENTRANCE WITHIN REVISED SITE BOUNDARIES
(A) RETAIN AS CONSTRUCTED AN EXTENSION TO THE REAR OF THE DWELLING HOUSE (B) RETAIN AS CONSTRUCTED ELEVATIONAL CHANGES MADE TO THE DWELLING HOUSE (C) RETAIN AS CONSTRUCTED THE VARIOUS DOMESTIC TIMBER SHEDS AND GLASSHOUSE (D) RETAIN AS CONSTRUCTED THE EXTERNAL WALLS CONSTRUCTED TO THE SIDE OF THE DWELLING HOUSE (E) RETAIN AS CONSTRUCTED THE AMENDED AREA OF THE STORAGE SHED AND (F) RETAIN THE HOUSE, SHEDS, GLASSHOUSE, EXTERNAL WALLS AND AGRICULTURAL BUILDING WITHIN REVISED SITE BOUNDARIES
(A) DEMOLISH THE EXISTING CONSERVATORY ATTACHED TO THEIR DWELLING HOUSE, (B) CONSTRUCT AN EXTENSION TO BOTH ENDS AND REAR OF THEIR EXISTING DWELLING HOUSE, (C) MAKE ALTERATIONS TO THE EXISTING DWELLING HOUSE AND ALL OTHER ASSOCIATED SITE WORKS
(A) Retention permission to retain the existing dwelling house, garden sheds, all associated site services and ancillary site works as-built on revised site layout and within revised site boundaries and (B) Full planning permission to change the use of the existing attic storage space at first floor level to a habitable space to be used as part of the existing dwellinghouse, install a gable window to each side and three roof windows all at first floor level, decommission the existing wastewater treatment system and install a new mechanical wastewater treatment unit and polishing filter and all other associated site works
CONSTRUCT A NEW DWELLING HOUSE WITH CONNECTION TO WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE SERVICES
The brief summarizes the pattern across all 327 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2561074The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief