Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 433 decisions within 5 km, 1 exact-site or onsite candidate record, and 21 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
21 structured nearby appeal records.
21 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to remove existing grass surface and to extend pitch with new 3G all weather surface complete with perimeter spectator fencing and flood lighting
Permission to construct a new dwelling house and all associated site works
Retention Permission to retain attic development, new front porch and rear living room extension as built onto old dwelling house (Built pre 1963) and for permission to erect a new extension to the East side with attic development, a flat roofed extension at first floor level to the rear of existing pitched roof to dwelling and a new porch to the West side and a small link corridor extension to the rear of the dwelling complete with minor elevation changes to front and sides and all ancillary site works associated with the development
To construct a new extension comprising one classroom and two special education rooms complete with associated site works and to replace the existing septic tank with new Mechanical aeration system and soil polishing filter.
(1) PERMISSION TO CONSTRUCT A NEW EXTENSION COMPRISING A SAFE SPACE AND WHEELCHAIR ACCESSIBLE UNISEX WC; RECONFIGURATION OF EXISTING MULTIMEDIA ROOM TO PROVIDE A SPECIAL CLASSROOM AND MULTIMEDIA ROOM; AND ALL ASSOCIATED SITE WORKS; AND (2) RETENTION PERMISSION TO RETAIN PARTIALLY CONSTRUCTED SHED ON SITE; AND (3) PERMISSION TO COMPLETE CONSTRUCTION OF SHED
ERECT A NEW STOREY AND A HALF STYLE DWELLING HOUSE ON SITE 16 "THE VILLAGE GREEN" PREVIOUSLY GRANTED PLANNING UNDER REF. NO'S 05/4196 AND 09/1567 COMPLETE WITH ALL ANCILLARY SITE WORKS
The brief summarizes the pattern across all 433 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561098The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief