Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 942 decisions within 5 km, 3 exact-site or onsite candidate records, and 87 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
87 structured nearby appeal records.
87 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development comprises a four-storey office and staff facilities area (1,301sqm) and a medical equipment area (4,061sqm), with an internal clear height of 12m and an overall height of 16.65m. The external area includes HGV/vans access/egress and marshalling yard, independent car parking access/egress with 37No. car parking spaces, including disabled and EV spaces, a covered bike park area, pedestrian accesses, and associated landscape & civil works
The development will consist of a) construction of new warehouse building with 2 storey ancillary office accommodation at ground and first floor levels (overall height 10.115m) and a total gross floor area of 2,009m2 (1,785m2 at Ground floor & 224m2 at 1st floor) on a site of circa 0.412 hectares; b) boundary wall to R135 and boundary fencing to other elevations. The development will also incorporate 26 standard car parking spaces, 2 no. wheelchair accessible parking spaces, 16 bicycle spaces, ESB substation, goods yard and all associated site development works
Retention permission for internal alterations to Block 4, units 3,5,8,9 &10, Ashbourne Business Park, Ashbourne, Co. Meath. The items for which Retention Permission is sought are as follows: 1. The removal of internal party walls and the removal of numerous original ancillary offices and WCs of adjoined units 3,5,8,9 &10 and reconfiguration of ancillary office & staff facilities located at Unit 3, resulting in: A. At Ground Floor Plan: Retention of Change of Use of 77m2 of Ancillary Offices and Staff Facilities Area to Warehouse due to the above alterations, resulting in 883m2 of Warehouse Area & 79m2 of Ancillary Office & Staff Facilities. B. At First Floor Plan: Retention of Addition of 69m2 of Ancillary Office & Staff Facilities due to the above alterations. 2. Associated elevational adjustments including the removal of an unrequired pre-existing exit door to unit 9, and the replacement of pre-existing exit doors to units 5,8,10 and 3 with fire exit doors. All external elements such as carparking, drainage, site access and landscaping remain unaltered as a result of these building layout adjustments
Development will consist of a single-storey bedroom and ensuite bathroom extension located between the existing house and garage and all associated siteworks.
Development will consist of internal alterations to a development previously granted planning permission under reference number AA/170346 to include the provision of a first floor office and for minor revisions to the elevations of same
The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points, 1 no. 8 bay canopy structure incorporating circa. 105 sqm of roof mounted solar panels. The proposed development also incorporates 1 no. ESB substation, the use of existing retail park access / egress and all associated above and below ground ancillary works.
The brief summarizes the pattern across all 942 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561163The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief