Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 83 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of partial demolition, with renovation and extension to the existing dwelling, Including hard and soft landscaping and all associated site works, along with temporary accommodation located on site for the duration of the construction process.
Development consisting of construction of a proposed dwelling house, garage, proprietary effluent treatment system and soil polishing filter, complete with all associated works
1. Upgrade of the existing septic tank system to an onsite sewerage system In accordance with EPA Code of Practice 2021. 2. Retention of rear and side extension to the existing domestic dwelling, previous planning permission PL94/19616 refers together with all ancillary site works
Proposed Replacement Of An Existing Septic Tank System With An Onsite Sewerage System With Polishing Filter In Accordance With EPA Code of Practice 2021 And All Ancillary Works
Development consisting of (1) retention of existing detached garage and (2) retention of all associated site works, all at existing house.
Development consisting of permission and permission for retention of alterations and extension to existing dwelling house and for existing storage shed along with ancillary works
The brief summarizes the pattern across all 83 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660130The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief