Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 117 decisions within 5 km, 3 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Roscommon County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Roscommon County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for Roscommon County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedNo current-dated citation is loaded for Roscommon County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Retention Permission to retain and complete the following (a) a single-storey flat roof extension to the rear of the existing building (b) elevational changes to all elevations of the existing building, along with all other associated site works at
To construct extension to side of existing toilet block at
Retention Permission and Permission for the following: Retention Permission is sought to retain (a) an existing generator installed onsite. Permission is sought for (a) the demolition of an existing fuel storage unit (b) internal renovations of the existing premises and shop layout together with elevational changes to the front, side and rear elevations (c) the construction of an external escape staircase to the side/rear of the existing premises (d) the construction of a new fuel storage unit (e) along with all other associated site works at
Retention Permission for the following; (a) solar panels previously installed on the forecourt canopy and the roof of the existing shop building (b) advertising signs on the west and east gables of the existing shop building (c) Ad Blue storage tank and associated pump (d) along with all other associated site works at
To: 1) Retain part as constructed carpark and revised car wash/car vac locations along with fuel storage unit and self service laundry booth. Permission to 2) Construct extension to carpark and carry out all ancillary site works at
Retention permission is sought to retain (a) as constructed ground floor cold room extension and orangery extension together with first floor laundry room extension to the rear of the existing building (b) as constructed pergola structure, canopy structure and service yard roof to the rear of the existing premises (c) retain all as constructed elevations of the existing building from that previously approved under planning reference no. PD/04/2379, along with all other associated site works at
The brief summarizes the pattern across all 117 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2660201The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief