Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
22% of nearby decided applications were refused. The site check found 342 decisions within 5 km, 8 exact-site or onsite candidate records, and 16 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
16 structured nearby appeal records.
16 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the completion of a vehicle dismantling facility previously approved under planning ref. no. 19806. The vehicle dismantling facility comprises of a single storey building (GFA = 905.95m2 & ridge height of 9.35m), external storage area for decontaminated and dismantled vehicles & parts, external service yard, landscaping and associated site development works
Extension of Duration on 19/806, Permission for a vehicle dismantling facility comprising of a single storey building (SFA - 905.95m2 & ridge height of 9.35m), external storage area for decontaminated and dismantled vehicles & parts, external service yard, retaining wall to part of north boundary, landscaping and associated site development works. **Significant Further Information received on 02/04/2020 to allow for remediation of the existing dismantling facility and removal of all associated external storage**
Permission for a vehicle dismantling facility comprising of a single storey building (SFA - 905.95m2 & ridge height of 9.35m), external storage area for decontaminated and dismantled vehicles & parts, external service yard, retaining wall to part of north boundary, landscaping and associated site development works. **Significant Further Information received on 02/04/2020 to allow for remediation of the existing dismantling facility and removal of all associated external storage**
Permission for development to consist of provision of a new 1890 m2 industrial building which has the potential to be divided into 2 no. 945 m2 units, together with all associated site development works.
Retention Permission for 1. Extension of site boundaries to include for an additional gravel hardstand area for car parking and cicrulation. 2. Minor alterations to the elevations of the partially built unit, to include for 2no. additional roller-shutter doors. 3. New single-storey office extension, together with permission to further extend and relocate the same. Permission for minor alterations to the partially built unit to be completed approved under planning ref: 19/605 including removal of roller shutter door, internal offices, toilets and associated windows & doors. Change of use of existing 1516m2 carpark and circulation yard to an external storage area, togther with all associated site development works.
Retention Permission for amendments to and relocation of existing wastewater treatment system and percolation area together with all associated site development works.
The brief summarizes the pattern across all 342 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660247The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief