Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 199 decisions within 5 km, 1 exact-site or onsite candidate record, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1. Demolish part of existing dwelling at the rear. 2 Build new extensions to the rear and front of existing house. 3 Construct a new roof.
CONSTRUCT A NEW DWELLING HOUSE, DETACHED GARAGE, CAR PORT, CONNECTION TO WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
(A) DEMOLISH EXISTING OUT BUILDINGS (B) CHANGE OF USE OF EXISTING DERELICT DWELLING HOUSE TO USE AS A GARDEN SHED/STORE FOR THE PROPOSED DWELLING HOUSE TO INCLUDE REAR ELEVATION CHANGES (C) CONSTRUCT A NEW DWELLING HOUSE (D) CONNECTION TO A PACKAGED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
Permission to construct 1 nr farm machinery shed, all in accordance with plans and particulars submitted
CONSTRUCT A DWELLING HOUSE WITH GARAGE AND ALL ASSOCIATED SITE WORKS
CONSTRUCT A GLAMPING SITE TO COMPRISE OF 4 NO GLAMPING PODS, RECEPTION BUILDING AND LAUNDRY FACILITIES, ON-SITE EFFLUENT TREATMENT SYSTM WITH PERCOLATION AREA, ACCESS ROAD, AND ALL ANCILLARY SITE SERVICES
The brief summarizes the pattern across all 199 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660253The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief