Executive snapshot
7% of nearby decided applications were refused. The site check found 235 decisions within 5 km, 3 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of a new ESB substation and all associated site development works necessary to facilitate the development
Retention planning permission is sought for existing single warehouse and office building as varied from grant of planning permission under planning ref no. 04/1699 and 10/183. is sought for the construction of a single storey warehouse extension to the rear and side of existing building, the construction of a single storey ESB substation and all associated site development works at
Is sought for works to existing warehouse building as permitted under grant of planning permission(s) ref no. 18-544 & 04-1699 & 10-183. As described hereunder a. Retention planning permission is sought to retain single storey factory area extension of 478 sq.m as varied from grant of planning permission under planning ref no. 18-544. b. Material change of use is sought for single storey warehouse area of 1089 sq.m to be changed to manufacturing use, as varied from grant of planning permission under planning ref no. 18-544. c. Planning permission is sought for new high bay warehouse with associated packing line, bulk silo towers and chimney stack of 3283 sq.m. d. Planning permission is sought for new bulk silo towers of 74 sq.m. e. Planning permission is sought for new goods staging area and loading bays of 181 sq.m. and all associated site development works, access roads and boundary treatments
For modifications to permitted development Planning Ref No. 17/830 to include for (A) alteration to permitted position of agricultural stables and hayshed on site (B) for permission to provide an open manure pit (C) for relocation of position of effluent slurry tank on site with all associated site works to lands location at
To erect a single storey dwelling house and garage, provide proprietary sewage treatment unit and percolation area, new water borehole, block up existing entrance and to create new vehicular entrance, to erect new agricultural stables and hayshed with manure pit and effluent storage tank, for change of use of existing changing rooms to agricultural store, for change of use of the existing site from playing pitch to residential/agricultural use with all associated site works to land located at
To construct a 4 cell integrated constructed wetland system of total approximate area 0.388 hectares and associated site works. The proposed integrated constructed wetland system shall be located on lands directly north of the Rednut Ltd facility site
The brief summarizes the pattern across all 235 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660287The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief