CONSTRUCT DETACHED DWELLING HOUSE AND DOMESTIC GARAGE TOGETHER WITH EFFLUENT TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
BEHYBAUN , BALLINA , CO. MAYO
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
7% of nearby decided applications were refused. The preview found 676 nearby planning records within 5 km where a location match is available.
- Matched source
- 171024
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Retain existing raft foundation as constructed on site, demolish existing damaged structure on raft foundation, construct new dwelling house on existing raft foundation, as plans submitted, and to carry out all ancillary works as required on site. Previous planning permissions P13/3186, P13/731860 refer
Retain and complete domestic garage/shed on site together with all ancillary works
DEMOLISH EXISTING DETACHED DWELLING HOUSE, CONSTRUCT REPLACEMENT DETACHED DWELLING HOUSE, TOGETHER WITH ALL ASSOCIATED SITE WORKS
CONSTRUCT EXTENSION TO THE NORTH BUILDING, INCLUDING LINK CORRIDOR TO ACCOMMODATE AN EXTENSION TO THE EXISTING LABORATORY AND ADDITIONAL STORAGE FACILITY AREA TOGETHER WITH ASSOCIATED SITE SERVICES
CONSTRUCT 2 STOREY DWELLINGHOUSE AND SINGLE STOREY DOMESTIC GARAGE, CONNECT TO ALL SERVICES AND PUBLIC UTILITIES, CARRY OUT ALL ANCILLARY SITE WORKS ON SITE LOCATED TO THE NORTH EAST OF PROTECTED MONUMENT REG NO 31303016
The brief summarizes the pattern across all 676 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 171024The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief