Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Milltown , Newbridge , Co. Kildare.Opens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Milltown , Newbridge , Co. Kildare.

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

21% of nearby decided applications were refused. The site check found 694 decisions within 5 km, 3 exact-site or onsite candidate records, and 52 structured appeals.

Matched source
171399
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

3 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

52 structured nearby appeal records.

52 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

694Nearby applications
3Site-linked candidates
21%Nearby refused
52Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

171399

Development of land (approximately 6 acres) adjacent to our existing GAA pitch. The development will consist of preparation and laying out of one new adult playing pitch and one under age playing pitch, the erection of boundary fencing and associated landscaping works, car park containing 56 car park spaces and proposed new walking track. Access to new pitches will be through existing entrance from public road and through existing car park beside clubhouse

Granted0.0 km06 April 2018
21134

For development at existing GAA pitches. The development will consist of 6 no. 18 meter high training lights and poles for main senior training pitch with 3no. extra light clusters on reverse to light juvenile pitch. Pitches previously granted permission under File Ref. 17/1399. Development to further include 17 no. 6 meter high lights and poles at 30 meter centres along new 2 metre wide walking track and all associated site works

Granted0.1 km05 July 2021
2160

(a) demolition of existing domestic shed and construction of a new single storey family flat type extension to side / rear of existing dwelling, (b) additional new single storey main kitchen / dining / utility extension to rear of existing dwelling house, (c) internal modifications, connection to existing services on site, landscaping and all associated development works

Granted0.2 km01 June 2021
2460601

For the construction of 2 no. detached, 4 bedroom, dormer dwellings, 2 no. on site effluent treatment systems and percolation areas, surface water to soak aways, shared recessed vehicular entrance and all associated site works

Granted0.2 km16 September 2024
17868

Construction of a new dormer/storey and a half house in side garden of parents house including demolition of existing office and sheds and incorporating new Oakstown effluent treatment system, new rainwater harvesting unit, new dual entrance and all associated site works.

Granted0.3 km23 March 2018
21622

Demolition of an existing porch, construction of an extension to the front and the side of the house, construction of a veranda to the front of the house, construction of a retaining boundary wall and related alterations to driveway, and all associated site works

Granted0.3 km11 August 2021

The brief summarizes the pattern across all 694 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required