Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 157 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct 309 metres length of a new 600 mm diameter land drain pipe, laid alongside the existing collapsed culvert
Construct a garage / storage shed and all associated site works
Retain dwelling house in location as construction & retention permission for altered site boundaries and entrance all of which was previously granted planning permission with reference 133/92 and all ancillary site works
Construct a dormer style dwelling house, domestic garage, septic tank and percolation area, new entrance and all associated and necessary site works
Construct telecommunications infrastructure comprising of; a 36 metre multi-operator lattice tower with antenna and dishes attached, associated equipment and cabinets, fencing, use of existing access and access track, and extension of access track
Develop as follows (A) New detached two storey four-bedroom dwelling. (B) All associated site development works, drainage, driveway access and landscaping to accommodate new dwelling. (C) Provision of a new waste water treatment system and percolation area to current EPA standards along with connection to group water scheme and a surface water soak away to meet BRE 365 standards.
The brief summarizes the pattern across all 157 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17634The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief