Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 125 decisions within 5 km, 6 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a dormer dwelling, entrance, works to roadside boundary, wastewater treatment system with polishing filter, mains water connection, soakpits and all other associated site works
To demolish existing non habitable cottage, upgrade existing wastewater treatment system to current EPA guidelines, construct new vehicular entrance and carry out works to roadside boundary
To construct a bungalow, garage, entrance, wastewater treatment system with percolation area, mains water connection, soakpits and all other associated site works
To construct a dormer bungalow, garage, entrance, wastewater treatment system with percolation area, mains water connection, soakpits and all other associated site works
The following external works to the existing school, the demolition and removal of the existing external stepped access and associated handrails to the West (Front) of the existing school and the construction of a new external stepped access and associated handrails to the West (Front) of the existing school, the erection of new fencing to the partial perimeter of the existing playground area to the West (Front) & North (Side) and the construction of new partial perimeter fencing to the North (Side) of the existing site boundary together with resurfacing of the existing playground areas, together with all associated and ancillary site works
To install a new wastewater treatment system & associated works
The brief summarizes the pattern across all 125 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17648The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief