Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,187 decisions within 5 km, 4 exact-site or onsite candidate records, and 125 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
125 structured nearby appeal records.
125 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
(A) PERMISSION TO CONSTRUCT A TEGRAL ROOF ON A STEEL PORTAL FRAME STRUCTURE OVER EXISTING TIMBER RACKS (B) PERMISSION TO RETAIN GARDEN CENTRE AS CONSTRUCTED. (C) PERMISSION TO RETAIN FUEL STORAGE BUILDING. (D) PERMISSION TO RETAIN TWO NUMBER PLUMBING STORAGE BUILDINGS AND PERMISSION TO RETAIN LOFTED STORAGE AREA AT FIRST FLOOR, OVER ONE OF THESE BUILDINGS, (E) PERMISSION FOR RETENTION OF LOFTED STORAGE AREAS AT FIRST FLOOR LEVEL IN MAIN BUILDING, (F) PERMISSION FOR RETENTION OF STORAGE AREAS AT SECOND FLOOR LEVEL IN MAIN BUILDING (G) PERMISSION FOR RETENTION OF ADVERTISING SIGNS (H) PERMISSION FOR RETENTION OF ALL ELEVATIONAL ALTERATIONS, (I) PERMISSION TO CONSTRUCT A NEW STAFF CAR PARK (18 SPACES), (K) PERMISSION TO CONSTRUCT A GROUND FLOOR AND FIRST FLOOR EXTENSION TO EXISTING BUILDING AND ALL SITE DEVELOPMENT WORKS
(A) PERMISSION TO CONSTRUCT A NEW DOUBLE HEIGHT ENTRANCE AREA TO EXISTING RETAIL ENTRANCE UNIT (B) PERMISSION FOR CHANGE OF USE OF PART OF PROPERTY AT GROUND FLOOR LEVEL FROM STORAGE AREA TO NEW SHOWROOM (C) PERMISSION TO RETAIN PART OF EXISTING GARDEN CENTRE AT GROUND FLOOR LEVEL. (D) PERMISSION TO CONSTRUCT AN EXTENSION TO EXISTING GARDEN CENTRE. (E) PERMISSION TO CONSTRUCT A NEW STORAGE AREA AT FIRST FLOOR LEVEL AND ALL SITE DEVELOPMENT WORKS
CONSTRUCT AN OPEN COVERED STORAGE BUILDING
CHANGE USE OF UNIT 1 FROM WAREHOUSE TO RETAIL USE AND TO CHANGE USE OF PART OF UNIT 2 FROM FAMILY ENTERTAINMENT FACILITY TO WAREHOUSE/STORAGE
CONSTRUCT A DETACHED COMMERCIAL BUS MAINTENANCE SHED, INCLUDING PARTIAL REMOVAL OF EXISTING SECURITY FENCING WITHIN SITE AND ALL ANCILLARY SITE WORKS AT SITE
(A) DEMOLISH FORMER ADVANCE TYRES BUILDING (B) CONSTRUCT 5 STOREY BUILDING COMPRISING OF THE CONSTRUCTION OF 67 APARTMENTS (D) CONSTRUCT CAR PARKING ON THE GROUND FLOOR ALL ANCILLARY SERVICES AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 1,187 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 181001The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief