Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 1,315 decisions within 5 km, 3 exact-site or onsite candidate records, and 123 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Louth County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Louth County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Louth County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
123 structured nearby appeal records.
123 matchedNo current-dated citation is loaded for Louth County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Urban Life Developments Ltd intend to make a planning application for ‘full’ planning permission for development at this site known as Nos.1 & 2 Mill Lane, Mill Lane itself, Trinity Street and R132/Bridge of Peace, Drogheda, Co. Louth. The development overlooks the River Boyne. The development will include the demolition, excavation and clearance of all existing buildings and structures on site, including derelict buildings and the construction of 41no.apartments comprising 23no. one bed and 18no. two bed apartments with private balconies and communal roof terrace over a total of ten storeys (comprising nine storeys of apartments and an undercroft car park). The proposed development includes a laundry room for residents, plant room and bicycle storage and 23no. car parking spaces. Vechicular and pedestrian access is via Mill Lane on to Trinity Street. Mill Lane will be upgraded as part of the development. A new pedestrian access is also proposed off the R132/Bridge of Peace. The development provides for all associated site works, lighting, parking, open space, landscaping and boundary treatments. *Significant Further Information Submitted 23/10/19 - a Natura Impact Statement has been submitted as part of the Signifcant Further Information**
Permission to vary development permitted under P.A. Ref. 18/1056 on a site known as No.s 1 & 2 Mill Lane, Trinity Street and R132 Bridge of Peace, overlooking the River Boyne and includes a pedestrian link beneath the Bridge of Peace to Fr. Connolly Way. A Natura Impact Statement (NIS) accompanies this application. The proposed development consists of an increase in the height and variations to the external and internal design and layout of the permitted apartment building resulting in an increase in the number of storeys from 10 as permitted to 11 storeys, comprising ten storeys of apartments and a lower ground floor level comprising an undercroft car park and communal facilities, an increase in the number of apartments from 41 no. to 49 no. in a mix of 27 no. 1 bed and 22 no. 2 bed apartment types. The area previously allocated to a laundry is now proposed as a management office. The proposed development also provides for a single storey stand alone ESB substation, in addition to all associated site development works, boundary treatments, landscaping and public lighting. The number of car parking spaces and upgrade proposals for Mill Lane itself and the pedestrian link under the Bridge of Peace permitted under P.A Ref. 18/1056 are unaltered. **Significant Further Information received 18/01/2021 provides for, inter alia, the provision of a laundry room at lower ground floor level, the reduction in size of the ESB substation, changes to the design of the eastern elevation to reflect internal design changes and clarification of the floor areas of the apartments**.
Permission for the change of use from a public house to 6 residential apartments, three one bedroom and three two bedroom apartments and all associated site works
Permission for the change of use from a Public House to Shared Accommodation and all associated site works at a Protected Structure - DB-227
Permission for the change of use of existing function room area from public house to gaming and amusement room with new signage over existing entrance, minor internal modifications to the existing licensed premises enabling separation between the licensed area and gaming and amusement room, and associated site works.
Permission for the following: 1. Change of use from public house to residential consisting of 5no. residential units. 2. Subdivision of existing building to 3no. 2-bedroom residential units with provision of private amenity space for each unit 3. Partial demolition of existing bar and toilets to the rear of existing building 4. Demolition of existing storage & refrigeration building to the rear of the existing building. 5. Construction of new 3-storey building to the rear of the site to provide 1no. 2-bedroom residential unit to the ground floor and 1no. 3-bedroom duplex unit to the 1st & 2nd floors with provision of private amenity space for each unit. 6. New boundary treatment along existing lane with new pedestrian access gates. 7. Provision of bicycle parking, bin store and communal garden 8. All associated site development and infrastructure works**Significant further information received on 5.9.23**
The brief summarizes the pattern across all 1,315 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 181056The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief