Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 176 decisions within 5 km, 5 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
OF MINOR ELEVATIONAL CHANGES TO THE NORTH AND WEST ELEVATIONS OF EXISTING DWELLING HOUSE
RETAIN MINOR ELEVATIONAL CHANGES TO THE NORTH AND WEST ELEVATIONS OF EXISTING DWELLING HOUSE
(A) CONSTRUCT EIGHT TRADITIONAL STYLE SEMI DETCHED HOLIDAY COTTAGES, (B) CREATE ADDITIONAL CAR PARKING LINKING THE TWO EXISTING CAR PARKING AREAS INTERNALLY (C) REDUCE THE NUMBER OF VEHICULAR ENTRY/EXIT POINTS (FROM THREE ENTRY POINTS AND THREE EXIT POINTS) TO TWO NUMBERS ENTRY POINTS AND ONE ONLY EXIT POINT ON TO THE N70, TOGETHER WITH ALL ASSOCIATED SITE WORKS
(A) CONSTRUCT 8 TRADITIONAL STYLE SEMI-DETACHED HOLIDAY COTTAGES, (B) CREATE ADDITIONAL CAR PARKING, LINKING THE TWO EXISTING CAR PARKING AREAS INTERNALLY, (C) REDUCE THE NUMBER OF VEHICULAR ENTRY / EXIT POINTS (FROM 3 ENTRY POINTS AND 3 EXIT POINTS) TO TWO IN NUMBER ENTRY POINTS AND ONE ONLY EXIT POINT ON TO THE N70, ALSO TO OMITTHE CUL DE SAC ACCESS ONTO THE LOCAL PRIMARY ROAD, TOGETHER WITH ALL ASSOCIATED SITE WORKS
A) CREATE ADDITIONAL HOTEL ACCOMMODATION WITHIN A NEW TRADITIONAL STYLE 1½ STOREY, 8 UNIT STEPPED TERRACE TYPE BUILDING FORM. UNITS 1, 2, 3 AND 4 WILL EACH CONTAIN A STUDIO APARTMENT AT GROUND FLOOR LEVEL AND A STUDIO APARTMENT AT FIRST FLOOR LEVEL. UNITS 5, 6, 7 AND 8 WILL EACH BE A TWO BEDROOM COTTAGE WITH LIVING AREAS AT GROUND FLOOR LEVEL AND BEDROOMS AT FIRST FLOOR LEVEL. B) CREATE ADDITIOANL CAR PARKING, LINKING THE TWO EXISTING CAR PARKING AREAS INTERNALLY. C) REDUCE THE NUMBER OF ENTRY/EXIT POINTS (FROM THREE ENTRY POINTS AND THREE EXIT POINTS ) TO TWO NUMBER ENTRY POINTS AND ONE ONLY EXIT POINT ON THE N70 ROAD. SERVED BY AN EFFLUENT TREATMENT PLANT AND SAND POLISHING FILTER TOGETHER WITH ALL ASSOCIATED SITE WORKS INCLUDING WATER ATTENUATION MEASURES
(A) DEMOLISH EXISTING ROOF AT THE FRONT AND REAR OF EXISTING DWELLING HOUSE (B) PLANNING PERMISSION TO PROPOSE A NEW ROOF WITH VELUX WINDOWS AND ALTER AND MODIFY THE INTERNAL LAYOUT WITH ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 176 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 181069The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief