Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 2,415 decisions within 5 km, 3 exact-site or onsite candidate records, and 209 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
209 structured nearby appeal records.
209 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Demolition of the northern two storey section of the existing St. Camillus building of St. Camillus Hospital, Limerick. The application includes for the construction of an extension to include a new two storey ward block extension and a single storey ward block. The two storey block will also contain an enclosed plantroom at roof level with escape corridor & stairwells. A new two storey entrance building will be provided incorporating a new link corridor with stairs & lifts connecting the new ward blocks to the remaining H block, the existing canteen, services and laundry buildings. The three-storey section of the hospital block will be refurbished to provide ancillary accommodation. The site works will include the construction of a landscaped courtyard to each ward block, a drop off area with overhead canopy supported by stone clad columns, an entrance plaza, 25 no. car parking spaces incorporating 3 no. disabled spaces), amendments to the existing car park, internal roads, pathways, landscaping and associated M&E & drainage infrastructure. The development will be carried out within the site of St. Camillus Hospital, Shelbourne Road, Limerick. The site contains within its curtilage four no. Protected Structures (RPS 339 Former Workhouse, RPS 340 Chapel, RPS 341 Rehabilitation Centre & RPS 342 Chimneystack). No works are proposed to these structures as part of this application
Extension of permission for planning ref. 18/1145: demolition of the northern two storey section of the existing St. Camillus building of St. Camillus Hospital, Limerick. The application includes for the construction of an extension to include a new two storey ward block extension and a single storey ward block. The two storey block will also contain an enclosed plantroom at roof level with escape corridor & stairwells. A new two storey entrance building will be provided incorporating a new link corridor with stairs & lifts connecting the new ward blocks to the remaining H block, the existing canteen, services and laundry buildings. The three-storey section of the hospital block will be refurbished to provide ancillary accommodation. The site works will include the construction of a landscaped courtyard to each ward block, a drop off area with overhead canopy supported by stone clad columns, an entrance plaza, 25 no. car parking spaces incorporating 3 no. disabled spaces), amendments to the existing car park, internal roads, pathways, landscaping and associated M&E & drainage infrastructure. The development will be carried out within the site of St. Camillus Hospital, Shelbourne Road, Limerick. The site contains within its curtilage four no. Protected Structures (RPS 339 Former Workhouse, RPS 340 Chapel, RPS 341 Rehabilitation Centre & RPS 342 Chimneystack). No works are proposed to these structures as part of this application
The construction of a single storey extension including link corridor to the existing Orthodontic Department at St. Camillus' Hospital, Limerick. The St. Camillus' Hospital site contains Protected Structures RPS 3339, RPS3340, RPS3341 & RPS 3342, and thus the proposed development is within the curtilage of a protected structure
The demolition of existing single storey garage and construction of a two storey extension to the side of an existing two storey dwelling and all ancillary works
The conversion of the attic area to a home office / study, the construction of a dormer window to the rear, alterations to front boundary wall to provide a car parking space to the front of the property and all associated site works
Construction of an 18m high shrouded monopole telecommunications structure, carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound together with associated ground equipment and associated site works
The brief summarizes the pattern across all 2,415 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181145The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief