Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 2,138 decisions within 5 km, 2 exact-site or onsite candidate records, and 285 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
285 structured nearby appeal records.
285 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development of a new 4th hole comprising of a new tee, fairway, green, pathways and other ancillary works. Works will also include the redesign of the existing 4th hole converting it into a practice academy as well as minor works to the current 3rd green surrounds
Disconnection of the existing foul and surface water drainage from the existing shared drainage line with No.4 & No.6 Kilruddery Cottages which runs through the site, and the installation of a new independent treatment system and percolation area for No.1 & No.3 Kilruddery Cottages. Existing foul drainage line for No.4 & No.6 Kilruddery Cottages will remain active. Installation of new surface water soakaway to serve No.1 & No.3 Kilruddery Cottages. All associated landscaping, drainage, ancillary site works and services
Removal of the existing telecommunication structure and the erection of a 59.5m high lattice support structure carrying antennas and dishes
The proposal is for Phase 1 of a 2-phase housing development and will consist of: A) The construction of 96 no. dwellings (and single storey crèche c. 175 sq. m.) comprising 10 no. 2 bedroom 2 storey houses, 65 no. 3 bedroom 2 storey houses, 1 no. 4 bedroom detached house (3 storey to front 2 storey to rear), 6 no. 3 bedroom ‘Courtyard’ dwellings (2 storey), and 11 no. part 2 storey/3 storey 4 bedroom ‘Courtyard’ dwelling, 3 no. 1 bedroom apartments in 1 no. 3 storey building; B) All ancillary development works including footpaths, landscaping boundary treatments, public, private and communal open space areas (including balcony or terrace), car and bicycle parking, single storey ESB substations/bicycle stores regrading/re-profiling of site where required and all ancillary site development/construction works (and all new site services connections); C) Vehicular access will be from the Southern Cross Road (R768) via the existing entrance serving Kilruddery House & Gardens & Parklands Office Park. The works will entail the talking-down, relocation and reconfiguration of the existing Kilruddery entrance gates and piers (a protected structure) further within Kilruddery House & Gardens, with new access to the proposed residential development via new overall revised entrance arrangement (including to existing dwelling) and access route. It is also proposed to provide pedestrian access to the north and pedestrian access to eastern boundary (from R761); the proposed development will allow for all roads, services and landscaping for Phase 1 and Phase 2 sites;
Complete entrance granted under planning reference number 15/1168 with alterations to layout so that the entrance will differ from conditions 8 & 9 granted under that permission. it is now proposed to recess the entrance 5m from edge of road with splayed walls with overall width of 6-8m but to retain as much of the masonry wall as possible in order to protect privacy to both the dwelling house granted under 15/1168 and adjoining properties to the east of the main road
For Phase 2 of a 2-phase housing development and will consist of: (A) The construction of 34 no. dwellings comprising 12 no. 2 bedroom 2 storey townhouses, 14 no. 3 bedroom 2 storey townhouses, and 8 no. 3 bedroom 2 storey semi-detached houses; (B) All ancillary development works including footpaths, landscaping boundary treatments, public, private open space areas, car and bicycle parking, single storey ESB substations/bicycle stores, regarding/re-profiling of site where required and all ancillary site development/construction works (and all new site services connections); (C) Vehicular access will be from the Southern Cross Road (R768) via the existing entrance serving Kilruddery House & Gardens & Parklands Office Park. The works will entail the taking-down, relocation and reconfiguration of the existing Kilruddery entrance gates and piers (a protected structure) further within Kilruddery House & Gardens, with new access to the proposed residential development via new overall revised entrance arrangement (including to existing dwelling) and access route. It is also proposed to provide pedestrian access to north and pedestrian access to eastern boundary (from R761); the proposed development will allow for all roads, services and landscaping for Phase 1 and Phase 2 sites;
The brief summarizes the pattern across all 2,138 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181183The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief