Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 359 decisions within 5 km, 2 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the following development: 1. Astroturf playing area measuring 40m wide by 80m long inclusive of 3.0m high perimeter mesh panel fencing and additional 3.0m high ballstop netting adjacent to existing ballwall. 2. Floodlighting to the Astroturf area consisting of six light columns each measuring 10m high. 3. Fencing, 1.2m high in the vicinity of the existing playground to create an exclusive parking area for users of the playground. 4. Separate entrance gates to GAA facility and playground. 5. Realignment and routing of access road within the GAA grounds. 6. Provision of additional parking spaces. Gross floor space of proposed works, 320sqm.
For the following development: floodlighting to playing pitch 1, consisting of six light columns each 20m high, power generator & associated ancillary works
For: a) the retention of the existing Athletic Club facilities & buildings on revised site boundaries and b) the installation of 4 No. additional floodlights to the track area & associated site works.Gross floor space of work to be retained 161.00sqm
And completion of revisions to a previously granted Athletic Club Training Hall building (Pl. Refs: 11/86 & 16/33). The revisions include a reduction in the gross floor space of the building within the previously granted footprint. The building now comprises a single storey general purpose room with ancillary toilets adjoining the main hall including a revised roof detail and all associated site works. Gross floor space of proposed works: 1,001 sqm
For construction of a new two-storey, 8-classroom, school extension with GP Hall (gross floor area approx. 1,428sqm.) & all associated site works. In addition, works will include minor internal alterations in the existing school building, & minor adjustment to existing windows and doors. Extent of external works to include: modifications to hard & soft landscaped areas including existing ball courts & play areas. Reconfiguration of vehicular access including roundabout & pedestrian access gate, set down areas and pedestrian access pathways within the site. A total of 24 on-site car parking spaces to be provided (inc. 2 no. disabled parking) sheltered bicycle rack & bin store new fence enclosure to fuel storage & site perimeter fencing. A new on-site wastewater treatment system will be provided with a rainwater harvesting system & all ancillary & associated site works. 3 no. existing temporary accommodation cabins to be demolished & surrounding area to be made good, including landscaping, as part of the overall site development works on a site area of circa. 2 hectares
For construction of a new two-storey, 8-classroom, school extension with GP Hall (gross floor area approx. 1,428sqm.) and all associated site works. In addition, works will include minor internal alterations in the existing school building, and minor adjustment to existing windows and doors. Extent of external works to include: modifications to hard and soft landscaped areas including existing ball courts and play areas. Reconfiguration of vehicular access including roundabout and pedestrian access gate, set down areas and pedestrian access pathways within the site. A total of 24 on-site car parking spaces to be provided (inc. 2 no. disabled parking) sheltered bicycle rack and bin store new fence enclosure to fuel storage and site perimeter fencing. A new on-site waste water treatment system will be provided with a rainwater harvesting system and all ancillary and associated site works. 3 no. existing temporary accommodation cabins to be demolished and surrounding area to be made good, including landscaping, as part of the overall site development works on a site area of circa. 2 hectares
The brief summarizes the pattern across all 359 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181336The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief