Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
23% of nearby decided applications were refused. The site check found 269 decisions within 5 km, 2 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Chun (a) cuid de mhonarcha a leagan - 105sqm, (b) síneadh a chuir leis an mhonarcha atá ann -205sqm. (c) athrú a dhéanamh ar dath an cumhdach miotail an mhonarcha atá ann ag Páirc Ghnó Shailearna. Spás urláir comhlán na n-oibreacha beartaithe - 205sqm. Spás urláir comhlán d'aon scartáil - 105sqm.
Sin (a) Leagan fortheach aon stóir le díon reidh ag aghaidh tosaigh an fhoirgnimh. (b) Tógáil píosa nua dhá stóir ag aghaidh tosaigh an fhoirgnimh. (c) Athruithe le déanamh ar an bhfoirgneamh reatha (d) Oibreacha suímh agus seirbhísí. (e) Athruithe ar an spás páirceála cairr, seachas é sin a ceadaíodh faoi ordú pleanála 18/1364. Spás urláir comhlán na n-oibreacha beartaithe 569 sqm
For development of a (i) school building extension (4,368sqm) over 3 levels. Incorporating classrooms, specialist teaching spaces, social spaces, multi-purpose hall, special education needs unit, reception, offices and ancillary accommodation. Services to include roof mounted photovoltaic panels, boiler, ESB substation kiosk and gas compound. (ii) The refurbishments to existing school building c1955, c1990 & c2013 (1184sqm). (iii) The demolition of two ancillary buildings (c1950s) and the existing prefab accommodation on the site. (iv) New site entrances & internal access roadway with set down area, car parking for 45no. spaces (including 1no. EV Charging point), 2no. covered bicycle stands, 1no. ballcourt, site lighting, new wastewater treatment system and percolation area, new site boundaries treatments and all ancillary site works. Gross floor space of proposed works: 4368sqm.
Chun foirgneamh seomra ranga réamhdhéanta sealadach a chur suas, mar aon le gach seirbhís a cheangal agus oibreacha uile eile suímh (gross floor space 100sqm) Previous Planning Ref 15/505
Chun teach nua cónaithe a thógáil chomh maith garáiste nua, córas searachais nua agus bealach isteach chuig an suíomh. Spás urláir comhlán na n-oibreacha beartaithe (teach) 255.3 sqm. (garáiste) 54 sqm.
For the provision of a two-storey, 19 sqm. extension to the side of the dormer dwelling, 8.3 sqm. to the ground floor, 10.7 sqm. at first-floor level, and a zinc-clad dormer to the rear of the dwelling accommodating a new 2.5 sqm. bathroom extension. Gross floor space of proposed works 21.5 sqm.
The brief summarizes the pattern across all 269 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181364The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief