Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 1,236 decisions within 5 km, 3 exact-site or onsite candidate records, and 110 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
110 structured nearby appeal records.
110 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
The proposed development will consist of the construction of 1 no. 3 and 4 storey office building consisting of 2 no. blocks with a central glazed atrium area and a screened plant area, solar panels and equipment at roof level, providing a total GFA of 12,641m2. The proposed road infrastructure, and site services as per the previously approved ref. ref 99/2073. Minor amendments to reg. ref. 99/2073 to include rearrangement of previously approved parking, the addition of 12 no. total car parking spaces, 200 no. cycles parking spaces, landscaping consisting of new tree planting, and grass planting, public lighting, and footpaths, ESB substation and switch room, and all associated site and infrastructural works. Revised by significant further information consisting of: Provision of a basement level car park (131 no spaces), access ramp and consequent revisions to the ground floor layout, site layout plans and minor amendments to the rear elevation.
Development of this c0.708ha site at Maynooth Business Campus Development (Prev approved Reg Ref 99/2073), bounded by the M4 motorway to the north, Ballygoran Road to the south, existing Blocks A, B and C Maynooth Business Campus to the west and existing Block F to the east, existing access off the R406 Straffan Road, Maynooth, Co Kildare. The proposed development will consist a 4-storey office development with a setback top floor over basement car park providing for a GIFA of 12,656m2 excluding basement. The building is subdivisible into 4 office units, Units D1, D2, E1 and E2. The development is to be constructed in 2 phases, Phase 1 includes Block D1 and D2, Phase 2 includes Block E1 and E2. There are an additional 175 car parking spaces proposed (in addition to the previous allocation of 200 spaces for Block D and E under Reg Ref 99/2073), 127 of which are at basement level and 48 are at surface level. There are 253 bicycle spaces proposed in addition to an ESB substation and switch rooms, 2 no plant rooms at roof level, minor revisions to previously approved site and all associated site works above and below ground. (Planning permission was granted for a previously approved office development on this site under ABP-304658-19 – KCC 18/1382)
Change of use from light industry to office use at first floor level of existing full height workshop area, with internal alterations to existing offices
Erection of a shelter approximately 2.6m in height to serve an existing EV charging terminal
For the training room to the rear of the ground floor, and the office space on the first floor at the front of the unit. Permission is also sought for a second training room to the rear of the ground floor and all ancillary site works
Change of use of 80sq.m warehouse space to office use, internal alterations and associated site works
The brief summarizes the pattern across all 1,236 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 181382The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief