Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 731 decisions within 5 km, 3 exact-site or onsite candidate records, and 57 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Wicklow County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Wicklow County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Wicklow County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
57 structured nearby appeal records.
57 matchedCitations are current-dated and carry policy name, section, page and source URL from the Wicklow County Council development plan.
2 matchedOpen preview
Open preview
Clubhouse building which will provide 4 no dressing rooms and ancillary rooms to facilitate the development, car parking area, 1 no new playing pitch circa 137 x 85m including 6 no floodlights to pitch, fencing to pitch, proposed secondary treatment system to current EPA guidelines and new percolation area, well and all associated site works
Extension of appropriate period of 18/1405 - clubhouse building which will provide 4 no dressing rooms and ancillary rooms to facilitate the development, car parking area, 1 no new playing pitch circa 137 x 85m including 6 no floodlights to pitch, fencing to pitch, proposed secondary treatment system to current EPA guidelines and new percolation area, well and all associated site works
Completion of works on site for that previously granted permission file ref 18/1405 for which the following was applied for; 1) proposed new clubhouse building which will provide 4 no dressing rooms and ancillary rooms to facilitate the development, 2) a new car parking area, 3) 1 no new playing pitch circa 137 x 85m including 6 no. floodlights to pitch, 4) proposed new fencing to pitch, 5) a proposed secondary treatment system to current EPA guidelines and new percolation area, 6) new well and all associated site works
Carry out works, to provide new pedestrian facilities and road safety improvements. The works will take place along the Ballyguilemore Road between Carrig View and the entrance to the proposed new St. Patricks GAA Pitch. The scheme includes for new footpaths and road widening works
Dwelling as constructed (without a restrictive ownership condition similar to condition no. 2 as granted under Plan Ref No. 01/5309) together with associated site works
Construction of 47 no. residential units (30 no. 3-beds and 17 no. 4-beds), 1-2 storeys in height in the form of 8 no. 4-bed semi-detached units (approx. 133.92 sqm), 1 no 4-bed detached units (approx. 113.92 sqm), 4 no. 4-bed semi-detached dormer units (approx. 158.49 sqm), 4 no. 4-bed detached dormer bungalow units (approx. 235 sqm), 14 no. 3-bed semi-detached units (approx. 113.2sqm) and 16 no. 3-bed dormer terraced units (approx. 125.2 sqm). Each residential unit has associated private open space in the form of gardens to the rear of each unit. A total of approx. 5,962 sqm public open space is proposed in the form of 3 no. open space areas and will include landscaped planting, lawns, children's play areas, seating areas and pedestrian linkages. The provision of 99 no. car parking spaces (94 no. onsite car parking spaces for each residential unit) and 5 no. accessible parking spaces. All pedestrian and vehicular access roads and footpaths will link to the northern Phase 1 of the overall development. The proposal provides for a new pedestrian link from the proposed development site to the Ballyguilemore Road at the south eastern corner of the site with a new pedestrian crossing across Ballyguilemore Road. All associated site and infrastructural works include provision for water services; foul and surface water drainage and connections; attenuation proposals; permeable paving; all landscaping works; boundary treatments; internal roads and footpaths; and electrical services. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the Planning Authority with this planning application
The brief summarizes the pattern across all 731 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 181405The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief