Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
20% of nearby decided applications were refused. The site check found 777 decisions within 5 km, 4 exact-site or onsite candidate records, and 77 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
77 structured nearby appeal records.
77 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1. Construction of two blocks each with four number three bedroom two storey terraced houses; 2. Construction of a detached four bedroom two storey dwelling; 3. For the completion of access roads, footpaths and public lighting to serve the proposed development; 4. For connection to the existing adjoining foul and surface water sewers and connection to adjoining water-mains; 5. For the provision of car parking facilities and public open spaces and; 6. For all associated site development works. Revised by significant further information consisting of; 1.The relocation of blocks 1 & 2 so that the separation distances to the adjoining boundaries has been increased as so that block 1 follows the same building line as the adjoining dwellings. 2. The redesign of blocks 2 & 3 so the overall ridge heights have been reduced and that there are only dormer windows located on the rear elevations of the dwelling 3.The proposed developments pedestrian footpaths now connect to the footpath of the adjoining Glendara Estate. 4. The road surface will be finished in a finished surface course of 45mm of Stone Mastic Asphalt, SMA 14 surf PMB 65/106-60 des, in compliance with with clause 942 of NRA/TII specification
For retention permission for two storey side extension with attic conversion as constructed, retention permission for existing front porch and permission for front canopy and door extension and subsequent sub-division of existing development for use as two bedroom two storey house (5a rochford green) and all associated site works
The construction of single storey extensions to the side and rear of our existing 2 storey semi-detached dwelling and all associated ancillary site development works
The construction of a single storey extension to the side of our existing two storey detached property and all associated ancillary site development works.
For the demolition of existing single storey conservatory and erection of a part dormer / part single storey extension to the rear of the existing dormer dwelling, construction of a new front porch, new window opening to front elevation, new rooflights to dormer roof surfaces together with all associated site works
Development will consist of retention of conversion of existing garage and widening of existing driveway together with existing storey extension to rear and side of existing 2 storey semi detached dwelling.
The brief summarizes the pattern across all 777 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181409The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief