Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 659 decisions within 5 km, 5 exact-site or onsite candidate records, and 51 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
51 structured nearby appeal records.
51 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
Of construction of steel framed storage building to side/rear of existing commercial premises, erection of advertising totem pole to front of site, erection of advertising signage over existing retail unit and all ancillary works
1. Renovations and alterations to existing dwelling including alterations to front elevation. 2. Construction of proposed single storey extension to existing side elevation. 3. Construction of storey and a half extension to rear of the existing dwelling. 4. Access via proposed double entrance granted under planning ref. no. 19/424. 5. Revisions to site boundaries previously granted under planning ref. no. 19/424 and all associated site works
Change of house type from 3no. three storey, detached houses as permitted under Pl Ref No. 18/1438 to 3no. two storey, detached house type units, modifications to internal site boundaries and all associated site development works. It should be noted that all road alignment and footpath works will be in strict accordance with the approved planning permission Pl Ref No. 18/1438.
(1) To demolish and remove what remains of a fire damaged house on site. (2) To construct 3 No. 3 storey detached houses. (3) To set back the existing boundaries to the rear (eastern), side (northern) and front (western). (4) To increase the height of the rear portion of the side boundary (southern) to 1.8m high. (5) All ancillary ground works associated with the proposed development
The subdivision of existing site, construction of a part single storey part storey and a half type dwelling, connection to existing services, new double recessed entrance and all associated site works
Demolition of existing front porch and single storey side extension. Construction of a new single storey front and side extension with flat roofs. A new single storey rear extension with pitched roofs. Existing vehicular access to be widened
The brief summarizes the pattern across all 659 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 181441The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief