Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 1,619 decisions within 5 km, 6 exact-site or onsite candidate records, and 181 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
181 structured nearby appeal records.
181 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a new gated vehicular and pedestrian access onto the Maynooth Road (R405) for access to facilitate future development and all associated site works. Revised by significant further information consisting of: revised red line boundary
18 no. warehouse/light industrial units with ancillary office and staff facilities in 1 no. block totalling 1,972 sq. metres. The proposed development includes connections to existing services at M4 Interchange Park, signs, internal roads, carparking, bicycle parking, landscaping, lighting, boundary treatments and ancillary works, with vehicular and pedestrian access from the R405 by access road and footpaths previously permitted by Kildare County Council under planning ref. 18/1442
Modifications to previously approved access road (Planning Ref. 19/1229) approximately 87m long, relocated to a new position, centred between 17m and 26m north-east of the approved road location, on a site situated south of the M4 and north of the R405
(i) a single storey extension (120 sq.m) to provide storage, circulation and staff facilities; (ii) a single storey extension (75 sq.m) to the existing play area to provide dedicated soft-play area for babies and toddlers up to five years of age; (iii) a single storey entrance porch (12 sq.m) to the main entrance; (iv) a two storey infill extension at the north eastern corner of the existing building to provide an office/meeting room (78 sq.m) at ground floor and which is linked at first floor to a new mezzanine floor within the existing building in order to provide an indoor football pitch (330 sq.m) at first floor level; (iv) an external storage area and facilities area (covered and enclosed) to the rear elevation and (v) the relocation and re-configuration of the previously permitted car park serving Base Entertainment Centre together with an additional 19 no. car parking spaces to serve the additional floor area sought to be retained in this application together with all ancillary landscaping, services, lighting and internal connections to the existing building necessary to serve the development sought to be retained
For amendments to the Warehouse and Light Industrial Development permitted under Kildare County Council Reg. Ref. 22/627 (as amended by Kildare County Council Reg. Ref. 24/87 and 24/88 and proposed to be amended by Kildare County Council Reg. Ref. 25/60553). The amendments principally comprise: the omission of Unit B (Warehouse with a Gross Floor Area of 2,622 sq m) and its associated infrastructure including 46 No. car parking spaces; and the provision of an ancillary car park comprising 193 No. spaces to serve Block C in the M4 Interchange Business Park. Access to the ancillary car park will be via the M4 Interchange Business Park. The amendments will also comprise: modifications to the permitted landscaping and boundary treatments; provision of bicycle parking; gates; and all associated site and development works
The construction of a new gated vehicular and pedestrian access onto the Maynooth Road (R405) for access to facilitate future development and all associated site works
The brief summarizes the pattern across all 1,619 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181442The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief