Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 1,436 decisions within 5 km, 4 exact-site or onsite candidate records, and 128 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
128 structured nearby appeal records.
128 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Proposed truck washing facilities comprising of: (a) The construction of 1 No. truck washing station and associated works. (b) New plant room - 6 sqm. (c) Provision of signage. (d) And all ancillary works
Alterations to exterior of existing office building to include new first floor cladding, windows and new back-lit halo signage, new replacement entrance lobby, canopy and extended link wall to new "totem" sign with back-lit halo lettering
Development will consist of the provision of a new pedestrian entrance to the front elevation, new free standing service sign in front of the new entrance, new service pylon at the entrance and 3 no, flagpoles all to the existing car showroom.
Of: (a) A two storey front extension to North West elevation of existing industrial building. This extension comprises of offices, Spare Parts compartment, Meeting Room and toilets and kitchen facilities. (b) A single storey extension to South East elevation of existing industrial building. This extension comprises of toilet and kitchen facilities. (c) 1 No. signage to front and 2 No. signage to side elevations. (d) Remedial work to existing boundaries and all ancillary site works
Consisting of works being carried out in the curtilage of protected structure 'Maudlins Farmhouse' RPS Ref. NS 19-096, at this site known as Maudlins House Hotel. The development will consist of the construction of an extension to Maudlins House Hotel over an existing basement carpark, with said extension proposed to be linked to existing hotel building at basement level only. The proposed extension comprises of 70 no. aparthotel rooms over 6 floors with office & linen room at ground floor, linen room on all upper floors, two passenger lifts, roof level plant room & all associated ancillary works. All goods deliveries will continue to the existing delivery yard & the existing Maudlins House Hotel entrance & frontage to the Dublin Rd. will remain unchanged. All foul & surface water discharge are to be connected into existing foul & surface water systems (network on site) with final discharge to the public mains. The planning is made further to planning applications 98/500157, 00/500113, 00/500124, 02/500024, 07/500124 & 20/294
Revisions to existing North, South and West elevations. The revisions will consist of erection of new metal cladding façade, add and remove some windows and doors on the elevations, remove existing canopy and erection of parapet walls, together with all associated works, all
The brief summarizes the pattern across all 1,436 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181490The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief