The construction of a front porch, a single storey rear extension, a 2- storey extension to the side and rear southeast corner comprising habitable and storage space, a bay window to the side and rear southwest corner, provision of solar panels to the southeast elevation and all associated internal and external-re-arrangements and ancillary works including appending to the existing percolation area.
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Boston Hill , Drinnanstown , Rathangan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
26% of nearby decided applications were refused. The preview found 281 nearby planning records within 5 km where a location match is available.
- Matched source
- 181509
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Split level dwelling house (single storey to front/single storey with attic storage to rear), effluent treatment plant, landscaping and all associated site development works. Access is via existing permitted family use laneway, all
Split level dwelling house (single storey to front/single storey to rear), effluent treatment plant, landscaping and all associated site development works. Access is via existing permitted family use laneway. All
New site boundary treatment consisting of 3 metre high raised soil berm, screen planting and post & wire fence along eastern and northern field boundaries to include the extended lands within the permitted recycling facility site. The proposed works will provide full screening of the permitted facility.
(A) Retention Planning Permission for machinery storage shed. (B) Retention Permission for storm water attenuation/storage tanks and associated silt separation building and all other site surface water drainage works discharging to onsite soakpits. (C) Full Planning Permission for new waste codes accepted on site. revised by Significant Further Information which consists of (a) new waste water treatment system and associated works, (b) revised drainage layout and all associated site works
(a) Extensions to side and rear of existing maintenance shed; (b) New 6 metre high concrete screen wall alongside public access; (c) All associated site development works
The brief summarizes the pattern across all 281 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 181509The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief