Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Townlands of Drehid Mulgeeth , Ballynamullagh Mucklon Kilmurray (Carbury By) , Killyon and Timahoe EastOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Townlands of Drehid Mulgeeth , Ballynamullagh Mucklon Kilmurray (Carbury By) , Killyon and Timahoe East

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

36% of nearby decided applications were refused. The site check found 191 decisions within 5 km, 1 exact-site or onsite candidate record, and 13 structured appeals.

Matched source
181514
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.

1 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

13 structured nearby appeal records.

13 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

191Nearby applications
1Site-linked candidates
36%Nearby refused
13Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

181514

A ten year planning permission to develop a renewable energy development. The proposed renewable energy development will comprise of (a) the construction and operation of 2 areas of solar photovoltaic arrays mounted on metal frames over an area of approximately 200ha, and having a maximum overall height of 3 metres over ground level; (b) Internal solar farm underground cabling; (c) 2 no. temporary construction compounds; (d) recreation and amenity works, including looped walk (upgrade of existing tracks and provision of new tracks, car parking and vehicular access); (e) 1 no. Battery Storage compound; (f) upgrade of existing tracks and provision of new site access roads; (g) site drainage; (h) forestry felling and replanting; (i) permanent signage; and (j) all associated site development and ancillary works. The proposed renewable energy development will have an operational life of 35 years from the date of commissioning. The overall renewable energy project also includes the provision of a 110kV substation with associated electrical plant, welfare facilities, waste water holding tank, security fencing, upgrade of existing tracks and provision of new site access roads, 110kV overhead line grid connection cabling with associated angle lattice masts and supporting polesets and all ancillary works, which is subject to a separate planning application made directly to An Bord Pleanála in accordance with Section 182A of the Planning and Development Act 2000 (as amended). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in relation to the project and accompanies this planning application. Revised by significant further information consisting of; Further Information Response Report; Updated Environmental Impact Assessment Report and Appendices; Updated Natura Impact Statement; Amended Planning Application Drawings, showing; amended access/amenity track (relocated to accommodate Marsh Fritillary habitat), updated amenity signage, clarification of road sectional drawings, additional substation cross section drawing. Updated photomontage booklet

Refused0.0 km22 October 2019
18303249

STRATEGIC INFRASTRUCTURE DEVELOPMENT (ABP Decision) 110kV onsite electrical substation with associated electrical plant, electrical equipment, welfare facilities and waste water holding tank and security fencing. 110kV overhead line grid connection cabling, upgrade of existing tracks and provision of new site access roads with all associated site development and ancillary works.

Granted0.7 km29 July 2020
22840

Constructing eight stables, a barn, a dungstead tank and all ancillary site-works

Granted1.7 km31 August 2022
201283

For the existing foundations and rising blockwork to the southern side of existing dwelling. The development will consist of planning permission for a single storey extension to the southern side of existing dwelling, and all ancillary site services

Granted1.7 km14 December 2020
21488

The construction of a detached single storey domestic garage and all associated site works

Granted1.8 km04 June 2021
181293

(a) Erection of single storey type dwelling; (b) Erection of garage/fuel store for domestic use; (c) Installation of proprietary waste water treatment system with soil polishing filter and all associated siteworks

Granted1.8 km10 June 2019

The brief summarizes the pattern across all 191 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required