Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
36% of nearby decided applications were refused. The site check found 191 decisions within 5 km, 1 exact-site or onsite candidate record, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A ten year planning permission to develop a renewable energy development. The proposed renewable energy development will comprise of (a) the construction and operation of 2 areas of solar photovoltaic arrays mounted on metal frames over an area of approximately 200ha, and having a maximum overall height of 3 metres over ground level; (b) Internal solar farm underground cabling; (c) 2 no. temporary construction compounds; (d) recreation and amenity works, including looped walk (upgrade of existing tracks and provision of new tracks, car parking and vehicular access); (e) 1 no. Battery Storage compound; (f) upgrade of existing tracks and provision of new site access roads; (g) site drainage; (h) forestry felling and replanting; (i) permanent signage; and (j) all associated site development and ancillary works. The proposed renewable energy development will have an operational life of 35 years from the date of commissioning. The overall renewable energy project also includes the provision of a 110kV substation with associated electrical plant, welfare facilities, waste water holding tank, security fencing, upgrade of existing tracks and provision of new site access roads, 110kV overhead line grid connection cabling with associated angle lattice masts and supporting polesets and all ancillary works, which is subject to a separate planning application made directly to An Bord Pleanála in accordance with Section 182A of the Planning and Development Act 2000 (as amended). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in relation to the project and accompanies this planning application. Revised by significant further information consisting of; Further Information Response Report; Updated Environmental Impact Assessment Report and Appendices; Updated Natura Impact Statement; Amended Planning Application Drawings, showing; amended access/amenity track (relocated to accommodate Marsh Fritillary habitat), updated amenity signage, clarification of road sectional drawings, additional substation cross section drawing. Updated photomontage booklet
STRATEGIC INFRASTRUCTURE DEVELOPMENT (ABP Decision) 110kV onsite electrical substation with associated electrical plant, electrical equipment, welfare facilities and waste water holding tank and security fencing. 110kV overhead line grid connection cabling, upgrade of existing tracks and provision of new site access roads with all associated site development and ancillary works.
Constructing eight stables, a barn, a dungstead tank and all ancillary site-works
For the existing foundations and rising blockwork to the southern side of existing dwelling. The development will consist of planning permission for a single storey extension to the southern side of existing dwelling, and all ancillary site services
The construction of a detached single storey domestic garage and all associated site works
(a) Erection of single storey type dwelling; (b) Erection of garage/fuel store for domestic use; (c) Installation of proprietary waste water treatment system with soil polishing filter and all associated siteworks
The brief summarizes the pattern across all 191 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181514The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief