Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 281 decisions within 5 km, 1 exact-site or onsite candidate record, and 21 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
21 structured nearby appeal records.
21 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development of a wind farm, recreation amenity trail and all associated works. The development will consist of the following: up to 12 no. wind turbines with a tip height of up to 169 meters and all associated foundations and hardstanding areas; 1 no. on-site electricity substation; 2 no. temporary construction compounds; all associated underground electrical and communication cabling connecting the turbines to the proposed on-site electricity substation; underground electricity cabling including joint bays on the public road connecting the proposed on-site electricity substation to the existing Dunfierth substation within the townland of Dunfierth via the L1004 public road; upgrade and extension to an existing recreation amenity trail and installation of signage, picnic tables and bicycle stands; upgrade of existing site entrance from the L5025 public road and use of 1 no. existing site entrance on the L5012 public road; provision of new site access tracks and associated drainage; upgrade of existing access tracks and associated drainage; tree felling; and all associated site development works including landscaping. Permission is sought for a period of 10 years and an operational life of 30 years from the date of commissioning of the entire wind farm. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) accompany this planning application. Revised by significant further information consisting of; changes in regard to the EIAR and NIS submitted
(a) retention permission for Pig weaner house and associated site works as constructed. (b) retention permission for Tool store and Loading Ramps as constructed. (c) permission to construct new feed store and storage silos. (d) permission to construct new farm office / canteen and washrooms. (e) permission to install new septic tank and percolation area and all associated site works
The construction of a storey-and-a-half type dwelling and detached domestic garage, Sepcon sewerage treatment system, well, shared recessed site entrance and all associated ancillary site works
The construction of a storey-and-a-half type dwelling and detached domestic garage, Sepcon sewerage treatment system, well, shared recessed site entrance and all associated ancillary site works
The construction of a storey-and-a-half type dwelling and detached domestic garage, Sepcon sewerage treatment system, well, shared recessed site entrance and all associated ancillary site works
The development will consist of the completion from foundation level of storey and a half type house, previously granted under file ref. 17/1178, (b) the installation of proprietary wastewater treatment system with percolation area, previously granted under file ref. 17/1178, (c) new recessed vehicular entrance and access drive way, previously granted under file ref. 17/1178, (d) bored well, previously granted under file ref. 17/1178 and all associated site works.
The brief summarizes the pattern across all 281 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181534The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief