Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 1,839 decisions within 5 km, 4 exact-site or onsite candidate records, and 281 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
281 structured nearby appeal records.
281 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development within the overall grounds of Leixlip Amenities Centre (Eircode: W23 R942). This is a new primary school opening in September 2019 and this start-up accommodation is required to enable the school to commence operation. The development will consist of the provision of a temporary primary school by way of construction of 2 No. prefabricated buildings (c. 282 sqm and 181 sqm) on a defined site area (c. 1420 sqm) to be enclosed within a 2 metre high welded mesh fencing and access gates with associated site works including provision of hard surface play area. Temporary permission for a period no longer than 5 years is being sought
The construction of a new temporary carpark with access off existing carpark lands to the west of Leixlip Amenities Centre.
Demolition of existing single storey changing rooms and main entrance area to the North and west of the building. Construction of new two storey extension to North, West and Southern elevations of the existing building to provide; new entrance/reception with café; new ground floor toilets, Studio rooms, new changing and shower facilities and extension to existing gym area. New first floor area to provide additional gym studio rooms, offices and storage. Façade of existing hall to be overclad including elevations change. All associated demolition, internal alterations, site landscaping and ancillary works. Floor space of proposed works circ. 2,082msq. Revised by Significant Further Information which consists of revisions to the carpark layout including entrance, circulation route and parking
To demolish existing generator steel fencing surround with provision for new masonry shed to house generator, demolish existing temporary prefabricated structures with provision for new metal clad industrial storage building, demolish existing dugout, demolish existing temporary prefabricated structure called ‘meeting room’ with provision for new 183sqm two storey clubhouse to include an outdoor terrace, new disabled access route, new roof mounted solar panels, new bicycle rack area, new soakaway pit, no proposed works to existing clubhouse which will remain in use as changing facilities, new connections into existing drainage and services and all associated site works
Of wheelchair accessible ramp with new access door to clubhouse and new security gate at bottom of ramp
Erection of new single storey porch extension to front and for bedroom extension over playroom to side. Also for alterations to first floor layout and attic conversion to storeroom and bathroom
The brief summarizes the pattern across all 1,839 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181553The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief