Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
32% of nearby decided applications were refused. The site check found 639 decisions within 5 km, 2 exact-site or onsite candidate records, and 85 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
85 structured nearby appeal records.
85 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Demolition of existing extension to rear of cottage and construction of new two-storey extension, removal of chimneys, upgrade of wastewater system, widening of existing vehicular entrance and associated landscaping.
For a single storey extension at the side of the house including ramps and ancillary works for proprietary sewage treatment and polishing filter and the retention of a conservatory
Retention: installation of a Septech 2000 Waste Treatment System and all associated site works
For A) The construction of 4 no. modular Glamping Pods with bicycle storage adjacent to the Pods, B) the provision of a new entrance off the existing site access, and C) The provision of a wastewater treatment system including all ancillary internal access roads, infrastructure, connection to existing drinking water well, landscaping and boundary treatments, and all associated site and development works, and services. Revised by Significant Further Information which consists of design changes to the pods.
A) The construction of 4 no. modular Glamping Pods with bicycle storage adjacent to the Pods, B) Modifications to the existing entrance, and C) The provision of a wastewater treatment system including all ancillary internal access roads infrastructure, connection to existing drinking water well, landscaping and boundary treatments, and all associated site and development works and services
EXTENSION OF DURATION:14/226 is being sought for (a) various minor amendments to the previously granted permission (03/1004) to the entire dwelling and stables as constructed; (b) planning permission is being sought for the construction of a flat roofed structure at first floor level to enclose the existing external balcony at the first floor master bedroom to the rear elevation and extending the master bedroom into the proposed new enclosed area all
The brief summarizes the pattern across all 639 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181569The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief