Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 259 decisions within 5 km, 3 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To retain alterations to permission granted by planning application Reference No. 18/613 with all associated site works
To construct additions and alterations to existing dwelling; the additions include the provision of granny flat accommodation, upgrading the existing septic tank system with all associated site works at
For indefinite retention of conversion of attic space to storage, home office and w.c. plus retention of existing roof windows. Planning Permission is also for new single storey extensions to the side and rear of our existing dwelling, plus minor alterations to our existing dwelling, plus all associated site works
For (1) Planning Permission for the construction of a part two-storey and part single-storey dwelling, a single-storey garage, site entrance and driveway, borewell, wastewater treatment system and drip dispersal system, and all associated site works and (2) Retention for a limited period of time of an existing mobile home, septic tank and associated site works until the proposed development for planning permission outlined above has been completed
To construct new dwelling, with attached domestic garage, install new ETU with percolation area, form new entrance and all associated site works
For a single storey extension to rear and side of existing dwelling comprising 3 bedrooms plus internal alterations together with all associated siteworks
The brief summarizes the pattern across all 259 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18613The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief