Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 237 decisions within 5 km, 2 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct a new dwelling house, domestic garage, waste-water treatment system with polishing filter, bored well and new site entrance
Construct a new dwelling, domestic garage, waste water treatment system with polishing filter, new bored well and new site entrance
Construct a cubicle shed over exiting silage slab and slatted tanks with loose straw area, calf shed with dung stead, walled silage slab, slatted loose shed over existing slatted tank, collecting yard extension and all associated site works
Provide for the upgrade of the Ballyroan Wastewater Treatment Plant and will comprise of the following: Installation of an additional new Sequence Batch Reactor (SBR) wastewater treatment stream complete with flow splitter chamber, air blowers, sludge wasting pumps and effluent pipework; Installation of a new above ground storm water holding tank complete with internal cleaning system, flow return system and associated access stairs and platform; Installation of a new above ground sludge holding tank complete with internal decant system and associated access stairs and platform; Installation of tertiary filter; Installation of wash water pumping station; Installation of a GRP kiosk to house electrical control panel and all ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
Upgrade the existing wastewater treatment plant to a capacity of 900 PE incorporating: selector tank, twin aeration tanks, three final settlement tanks, flow splitting chambers, sludge return and wastage pumps, air blowers, sludge storage tank, interconnecting pipework and ducting, welfare facilities and internal access road extensions. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the planning application
Retain an existing telecommunications support structure (previously granted under Plan Ref No. 11/190) together with associated ground equipment within a fenced compound and access track
The brief summarizes the pattern across all 237 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18617The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief