Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,364 decisions within 5 km, 4 exact-site or onsite candidate records, and 111 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
111 structured nearby appeal records.
111 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the (a) extension of the filling station forecourt within the site boundaries to include new forecourt canopy 5m high, 3 no. new dispensing pumps and islands, customer parking and pedestrian access from the public footways (b) new underground fuel tanks (3 x 40,000 litres) to replace the existing (3 x 14,000 litre and 28,000 litre), (c) alterations to the existing commercial premises to include an increase in floor area from 230 sqm to 540 sqm (d) to include the existing retail of 100 sqm repositioned, new food and coffee franchises with preparation and wash up areas, a seating area (45 sqm), main store, ancillary areas, utility service, customer toilets and entrance lobby (e) associated site drainage including new forecourt interceptor and grease separator, building and site signage and any ancillary contingent works
For a revision to the approved site forecourt and building layouts as approved under Reg Ref 18/795 to now include (a) retaining the existing forecourt canopy in lieu of the proposed canopy granted and the removal of part of and refurbishment of the existing canopy (b) the provision of 2 no. Electric Vehicle charging points and an Air / Water services point and (c) A reduction in the overall proposed floor area within the building from 540 sqm to 410 sqm and any ancillary contingent works
For an Off-Licence (Area 10.00m2) within and subsidiary to the Retail area and all associated contingent work within the site layout granted planning permission under Reg Ref 21/801
To indefinitely retain 2 no. horticultural poly-tunnel canopies and 1 no. poly-tunnel required for display of plants and shrubs; 2 number poly-tunnels for the protection, potting and growing of plants and shrubs, in connection with the Flower Power Garden Centre (previous planning permission ref: 09/93 refers) at
(1) Retention permission for a metal clad garage/storage shed. (2) Permission for the construction of a storey and a half style dwelling served by the public sewer and all associated site works
(1) Retention permission for a metal clad storage shed (2) Permission for the construction of a story and a half style dwelling served by the public sewer, and all associated site works (3) Permission for a separate single-story modular dwelling to be used as temporary accommodation during the construction of the main dwelling
The brief summarizes the pattern across all 1,364 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18795The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief