Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,348 decisions within 5 km, 5 exact-site or onsite candidate records, and 109 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
109 structured nearby appeal records.
109 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of demolition of existing agricultural buildings, the proposed construction of 58 No. residential dwellings comprising; (2 no. two storey semi-detached 3 bedroom dwellings, 4 No. two storey 4 bedroom semi-detached dwellings, a mix of 5 No. three storey duplex terraces to accommodate 14 No. 1 bedroom apartments, 18 no. 2 bedroom dwellings & 20 No. 3 bedroom dwellings), 3 No. communal refuse storage pavilions, ESB substation, provision of internal roads and footpaths, surface level car parking, public lighting, landscaping, public open space, boundary treatments, site entrance off Hebron Road including associated pedestrian crossing facilities and upgrades to existing footpath, provision of foul and surface water disposal and all associated site works.
For the demolition of existing residence and agricultural buildings, the proposed construction of 8 no. residential duplex dwelling comprising; ( 4 no. 1 bedroom dwellings and 4 no. 3 bedroom dwellings), 1 no. communal refuse storage pavilion, provision of internal roads and footpaths, surface level car parking, public lighting, landscaping, public open space, boundary treatments, site entrance off Hebron Road including associated pedestrian crossing facilities, provision of foul and surface water disposal and all associated site works
On P21/427
For a) the demolition of the existing east and south boundary walls, b) the construction of a residential development containing 4 No. Apartments (3 No. 2 Bed Duplex Apartments and 1 No. Ground Floor 1 bed Apartment) Total Gross Floor area c. 340 sq.m and c) the construction of a standalone bin and bike store, along with all associated site development and landscaping works. All works are to take place to the rear
For development at this site, within the curtilage of St Johns Senior School. The development will consist of a prefabricated building for Special Needs Unit containing two classrooms, sanitary facilities and ancillary rooms, provision of foul and surface water disposal and all associated site works
Primary Healthcare Centre and Community Resource Centre comprising a three storey structure and recreational facilities and landscape improvements. The Primary Healthcare Centre facility will provide for HSE health and social care services and General Practice and associated meeting rooms, administrative offices, staff accommodation, receptions and ancillary uses. External works to the structure include roof plant and signage. The Community Resource centre will be an own door facility located in the ground floor of the proposed structure. The proposals also include a new vehicular entrance off Golf Links Road, car and bicycle parking, a set down area, footpaths, cycle paths, an ESB sub-station and waste store, pumping station, lighting and a totem sign. The recreational facilities comprise the provision of a school sports practice field and associated works and landscape works and improvements to the existing open space and ponds to form a public park
The brief summarizes the pattern across all 1,348 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18830The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief