Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 140 decisions within 5 km, 3 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
10 YEAR PLANNING PERMISSION FOR DEVELOPMENT AS FOLLOWS: COMPLETION OF APARTMENTS NO. 8-12 & 14-26, CONSTRUCTION OF APARTMENTS NO. 1-7 & 13 WITH REVISED DESIGN, COMPLETION OF 52 BEDROOMED HOTEL WITH HEALTH SPA, COMPLETION OF A WASTE WATER TREATMENT PLANT WITH SOIL POLISHING FILTER DRINKING WATER TREATMENT PLANT AND UNDERGROUND FIREFIGHTING WATER STORAGE TANK, COMPLETION OF ALL ASSOCIATED SITE WORKS INCLUDING ACCESS ROADS, PATHS AND ON-SITE CARPARKING WITH REVISED DESIGN TOGETHER WITH ALL ANCILLARY SITE WORKS P04/3568 REFERS
The development will consist of the completion, alterations and extension to the layout of the hotel permitted under planning permission P04/3568, PL 16.213947 and P18/943 consisting of (a) a change from 52 No. single bedrooms to 15 No. single bedrooms with 15 No. 2-bedroom suites and 10 No. 1-bedroom suites, (b) changes to the foyer, bar, lounge, dining room, function room, kitchens, toilets, staff facilities, offices, gymnasium, laundry and all ancillary service spaces and (c) extension for plant room, refuse area, general storage and bicycle storage with all ancillary site works. This Planning Application is accompanies by a Natura Impact Statement.
Construct a private dwelling house, domestic garage, a proprietary effluent treatment system and ancillary site development works
Construct a dwelling house, garage and proprietary effluent treatment system
CONSTRUCTION OF EXTENSIONS AND ALTERATIONS TO EXISTING FAMILY DWELLING HOUSE. ONE EXTENSION WILL BE TO THE EAST SIDE OF THE HOUSE, THE OTHER EXTENSION WILL BE A GARAGE LINKED TO THE WEST SIDE OF THE HOUSE, TO INCLUDE ALL ASSOCIATED AND ANCILLARY SITE WORKS AND LANDSCAPING WORKS
CONSTRUCT DWELLING HOUSE AND PROPRIETARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS
The brief summarizes the pattern across all 140 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18943The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief