Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 58 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A 10-year planning permission with a 30-year operational life for development on a site area of 3.23 hectares in the townland of Ticknevin, Carbury, Co. Kildare. The development will consist of up to 1 (one) wind turbine with a tip height of up to 187 metres, and all associated foundations and hardstanding areas, 20 metres of new wind farm road, and all associated underground electrical and communications cabling. This single turbine application forms part of a larger wind farm development located within County Offaly and Kildare with a separate planning application being submitted to Offaly County Council concurrently. The overall development will consist of up to 9 turbines (8 in Offaly and 1 in Kildare) with a tip height of up to 187 metres, and all associated foundations and hardstanding areas, approximately 4,750 metres of new internal access roads, associated drainage and turning areas; upgrade of approximately 3,500 metres of the existing L50062 public road including upgrade of the existing bridge; a new bridge crossing of the Figile River to provide access between Turbine 3 and Turbine 4; a 2,950-metre recreation trail and all associated development to include gravel pathways, a footbridge across the Figile River, a parking area, signage, information boards and outdoor fitness equipment; an off-site electrical substation and a battery energy storage facility; all associated underground electrical and communications cabling to connect the turbines to the substation including approximately 1,550 metres along the R401 Regional Road, a spoil storage area; a permanent meteorological mast up to 110.5 metres high; 2 No. temporary construction compounds; 2 No. temporary blade adapter set-down areas within the wind farm site and at the junction of the R402 and R401 at Rathmore, Edenderry, Co. Offaly; turbine delivery route works including widening of the junction of the R420 and R402 at Ballina, Geashill, Co. Offaly and all associated site development works. This application is accompanied by an Environmental Impact Assessment Report and a Natura Impact Statement,
(A) CONVERSION OF EXISTING ATTIC STORAGE SPACE TO HABITABLE ROOM, (B) INCREASED ROOF HEIGHT, (C) 30M2 OF GARDEN SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A SITE AREA OF 60.674 HECTARES. THE DEVELOPMENT WILL CONSIST OF UP TO 8 (EIGHT) WIND TURBINES WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDGE ACROSS THE FIGILE RIVER, A PARKING AREA, SIGNAGE, INFORMATION BOARDS AND OUTDOOR FITNESS EQUIPMENT; AN OFF-SITE ELECTRICAL SUBSTATION AND A BATTERY ENERGY STORAGE FACILITY; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING TO CONNECT THE TURBINES TO THE SUBSTATION INCLUDING APPROXIMATELY 1,550M ALONG THE R401 REGIONAL ROAD; A SPOIL STORAGE AREA; A PERMANENT METEOROLOGICAL MAST UP TO 110.5 METRES HIGH; 2 NO. TEMPORARY CONSTRUCTION COMPOUNDS; 2 NO. TEMPORARY BLADE ADAPTER SET-DOWN AREAS WITHIN THE WIND FARM SITE AND AT THE JUNCTION OF THE R402 AND R401 AT RATHMORE, EDENDERRY, CO. OFFALY; TURBINE DELIVERY ROUTE WORKS INCLUDING WIDENING OF THE JUNCTION OF THE R420 AND R402 AT BALLINA, GEASHILL, CO. OFFALY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE OVERALL DEVELOPMENT IS FOR A NINE (9) TURBINE WIND FARM, WITH A SEPARATE PLANNING APPLICATION BEING SUBMITTED TO KILDARE COUNTY COUNCIL FOR ONE (1) TURBINE LOCATED IN THE TOWNLAND OF TICKNEVIN, CARBURY, CO. KILDARE. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE APPLICATION
(A) ERECTION OF BUNGALOW TYPE DWELLING (B) GARAGE / FUEL STORE FOR DOMESTIC USE (C) THE INSTALLATION OF A SEPTECH 2000 TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITEWORKS ON SITE PREVIOUSLY GRANTED PLANNING PERMISSION UNDER FILE REFERENCE 07/1200
A new single storey dwelling house with detached garage with fuel storage, tertiary treatment system and infiltration /treatment area, site entrance, site boundaries with landscaping details and all ancillary site works/services.
For (a) Demolition of kitchen extension to rear of existing cottage (b) Single storey and storey and a half extension to rear and side of existing cottage (c) Single storey porch to front of existing cottage (d) Modifications to windows to all elevations of existing cottage (e) Upgraded effluent treatment plant and percolation area (f) New metal clad roof over existing cottage (g) All associated site development works. Revised by Significant Further Information which consists of: 1. Relocation of effluent treatment system 2. Development of new site entrance + access driveway
The brief summarizes the pattern across all 58 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 191323The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief