Continuance of use of existing premises comprising of offices, precast concrete manufacturing plant, wastewater treatment plant and ancillary works including yard, concrete batching plant, storage silos/tanks, aggregate storage bays and gantry crane (previously granted permission Ref. 08/1396 - PL09.233654)
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Hempstown Commons , Blessington , Co. Kildare.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
16% of nearby decided applications were refused. The preview found 440 nearby planning records within 5 km where a location match is available.
- Matched source
- 191363
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The construction of new 216sqm dormer-storey house, wastewater treatment unit and percolation area, amendments to existing entrance and associated works
Construction of new 216 sq.mt dormer-storey house, with 71 sq.mt. basement garage, wastewater treatment unit & percolation area, amendments to existing entrance and associated works
The building of a dormer type dwelling with single storey annex, to be serviced with small on site wastewater treatment system to current EPA guidelines and for all associated siteworks including planning permission for upgrade/replacement onsite wastewater treatment system to current EPA guidelines in lieu of the existing septic system serving the existing dwelling adjacent (belonging to my parents). The proposed dwelling will be accessed via the existing shared entrance and driveway serving my parents dwelling,
To construct 1) A single storey bungalow type dwelling which will incorporate a family flat to be occupied by my brother Alan Cullen, who requires supervised independent living accommodation. 2) A secondary sewage treatment system with percolation area. 3) A bored well. 4) All associated ancillary ground works. This site will be accessed from the public road via my parents existing driveway under an agreed right of way arrangement. All of the above works on my site
Extension of duration 07/443 continued operation of a sand, gravel,stone and rock quarry on 14.4 hectares of land. The permission is sought for a period of 30 years. The development is for the provision of aggregate materials by extraction,for construction purposes etc
The full report covers all 440 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €29 incl. VAT.
Source match
Matched from public planning record 191363The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report