Executive snapshot
9% of nearby decided applications were refused. The site check found 82 decisions within 5 km, 2 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
THE CONSTRUCTION OF AN EXTENSION TO THE FRONT AND SIDE OF THE EXISTING WALSH ISLAND GAA CLUB BUILDING APPROXIMATELY 150 SQ.M IN SIZE, CONTAINING MEETING ROOMS, KITCHEN/ FOOD PREPARATION AREA, TOILETS AND STORAGE, INCLUDING ALL ASSOCIATED SITE WORKS, WITH ACCESS THROUGH THE EXISTING ENTRANCE
Retention of front entrance, garage, fuel shed, garden gazebo, all as constructed and site works and services
Reducing site area and provide entrance gate off the laneway on the northern boundary.
CONSTRUCTION OF MODIFICATIONS TO WIDEN AND IMPROVE SIGHTLINES OF EXISTING ENTRANCE AND ALL ASSOCIATED SITE WORKS
(A) FOR EXCAVATION WORKS (B) PLANNING PERMISSION FOR CONSTRUCTION OF STRAW BEDDED LIVESTOCK SHED WITH UNDERGROUND SLATTED TANK AND ALL ASSOCIATED SITEWORKS
A) CONSTRUCTION OF SILAGE PIT B) CONSTRUCTION OF CUBICLE SHED WITH ASSOCIATED UNDERGROUND SLATTED TANKS C) INSTALLATION OF SOLAR PANELS ONTO ROOF OF PROPOSED CUBICLE SHED AND ALL ASSOCIATED SITEWORKS
The brief summarizes the pattern across all 82 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19182The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.