Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 755 decisions within 5 km, 2 exact-site or onsite candidate records, and 34 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
34 structured nearby appeal records.
34 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development consisting of (1) retention of an attic dwelling conversion (103.65 m2) including 4 dormer windows to the front, (2) retention of existing lounge window as a replacement of two lounge windows to the front and (3) retention of garage to the rear (37.21 m2).
Development consisting of the demolition of an existing single storey dwelling and outbuildings, the erection of a new dwelling house with associate out buildings, provision of waste water treatment system and percolation area, landscaping, alteration to the existing site entrance and ancillary works.
To construct domestic dwelling house along with domestic garage, new treatment system and percolation area and all ancillary site development works
Development consisting of change of use of existing cottage from residential use to educational use. Refurbishment of cottage and all associated site works. Access to site via existing site entrance.
PP - for development consisting of (1) demolition of existing external shelter and flat roof kitchen/utility to rear of existing building; (2) carrying out of change of use to existing building from day care centre to democratic school (total relevant floor area = 235.18 sq.m) - consisting of 3 no multi-purpose rooms, kitchen, library, lobby, general hall with ancillary corridors/stairwell and associated sanitary, office/storage accommodation; (3) carrying out of essential repairs, internal alterations and associated elevational changes to existing building; (4) construct new vehicular entrance, exit, car park and drop off area to the western side of the site; (5) replacing existing septic tank system with a proprietary tertiary effluent treatment system and polishing filter (previous planning permission PL13/327 refers); (6) carrying out all associated ancillary site works to include provision of services landscaping and boundary treatment at "Former Dunally School" (protected Structure RPS No. 289 under Sligo and Environs Development Plan)
Retention of a first-floor extension (37 m2) to an existing dwelling for domestic residential use, constructed in addition to a previously approved ground-floor extension
The brief summarizes the pattern across all 755 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19280The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief