Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 144 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
PP - development consisting of (1) Construction of extension to rear and side of existing dwelling house; (2) Carry out alterations and refurbishments to existing dwelling house associated with the proposed works, together with all ancillary site works
A) A total of 57 No. residential units consisting of 18 No. – Type A – 2 Bed Semi Detached and Terraced Houses 27 No. – Type B – 3 Bed Semi Detached and Detached Houses 12 No. – Type C – 4 Bed Semi Detached and Detached Houses b) Pedestrian, cycle and vehicular access/egress, c) All car parking, landscaping, boundary treatments, pedestrian links, public lighting, service connections and all associated site works
(1) The demolition of a 2 no. existing single storey semi-detached dwellings (F56 VK49 & F56 CH58) to allow for (2) the construction of 10 no. single-storey semi-detached two-bedroom dwellings, together with the construction of a new vehicular junction onto the local road, a pedestrian walkway onto the same local road, on-site storm water attenuation, connection to the public existing sewer systems, works to the site boundaries and all associated site development works including lighting and hard and soft landscaping
This development will consist of retention and completion of Units No.1 and No.2, to include 2no. habitable rooms and 1no. en-suite in the attic space to both units, with stairs provided on ground floor, from that granted under P23/60225, including all other ancillary site works and services.
Development consisting of (i) construction of a dormer dwelling house, (ii) construction of a domestic shed, (iii) construction of retaining wall to the rear, (iv) connection to all services and, (v) carrying out of all ancillary site works - CONDITION 9 COMPLIED WITH
Development consisting of the following; to demolish existing boundary wall & block up an existing entrance. Construct new roadside vehicle drop off and footpath. Re-align boundary wall, entrances, landscaping & public lighting and carry out ancillary site works
The brief summarizes the pattern across all 144 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19496The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.