Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Capdoo , Clane , Co. Kildare.Opens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Capdoo , Clane , Co. Kildare.

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

22% of nearby decided applications were refused. The site check found 867 decisions within 5 km, 12 exact-site or onsite candidate records, and 51 structured appeals.

Matched source
19830
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

12 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

51 structured nearby appeal records.

51 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

867Nearby applications
12Site-linked candidates
22%Nearby refused
51Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

19830

Sub-dividing an existing site, upgrading/improving an existing vehicular entrance which serves the lands, constructing a new access road, three No. detached houses comprising of 1 No. part one and half storey and part dormer type dwelling, two No. dormer type dwellings, vehicular entrances, boundary treatments, connections to public foul drain system, and all associated ancillary site-works

Granted0.0 km21 January 2020
20442

Sub-dividing a site, de-commissioning an existing septic tank system, and connecting to public foul drain system in lieu, constructing a part one and half storey and part dormer type dwelling, connection to public foul drain system, and all associated ancillary site-works

Granted0.0 km07 July 2020
2560382

For retaining a concrete base as constructed to hold a domestic garage, construction of a detached domestic garage, and all associated ancillary site-works

Granted0.0 km26 August 2025
2560713

For sub-division of an existing site, construction of a one and half storey detached type dwelling, detached domestic garage, connection to public foul drain system, and all associated ancillary site-works

Granted0.0 km22 October 2025
181517

1. To construct 7 no. 3 storey detached house, 2. Provide a vehicular entrance off Capdoo Lane to service the proposed development. 3. Provide 1.8m high walls to the North, South and East boundaries. 4. To raise the ground level of the site to accommodate a gravity feed of the foul and surface water sewers into the existing public sewers. 5. All ancillary ground works associated with the proposed development.

Refused0.1 km19 February 2019
2560362

For sub-dividing the existing site and the construction of four no. Detached dwellings consisting of 2 no. detached storey and half dwellings and 2 no detached dormer bungalows, decommissioning of existing septic tank, up-grade of existing entrance, connection to public foul sewer, and all associated ancillary site-works. Revised by Significant Further Information which consists of sub-dividing the existing site and the construction of three no. detached dwellings consisting of 2 no. detached storey and half dwellings and 1 no detached bungalow, decommissioning of existing septic tank, up-grade of existing entrance, connection to public foul sewer, and all associated ancillary site-works.

Granted0.1 km16 December 2025

The brief summarizes the pattern across all 867 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required