Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 293 decisions within 5 km, 1 exact-site or onsite candidate record, and 17 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
17 structured nearby appeal records.
17 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A dwelling house, new vehicular entrance, waste water treatment system and all associated site works
The demolition of existing garage, construction of a ground floor single storey rear and side extension, solar panels to the roof, front elevational changes to existing windows and door, a new attached garage and all associated site works
Extension to existing dwelling house to form a dormer style dwelling, including the demolition of a previous extension, with additional bedrooms, living areas and kitchen area, including all necessary site works
The following works to the existing dwelling house, comprising of the following: the partial demolition of the existing dwelling house, refurbishment and alteration of the existing dwelling house and garage and the construction of a new extension to the rear (north east), sides (north west and south east) and front (south west) of the existing dwelling house together with a new first floor extension all connecting to the existing on-site septic tank and percolation area together with all ancillary and associated site works
Indefinite retention and conversion of the following existing construction works at existing crèche, comprising of the following: at Lower Ground floor level, 4 no. classrooms with ensuite toilets, at Ground Floor Level additional cloak room area to the front (west) of the existing building together with link corridor and at attic area the conversion of the store room to new staff room with staff wc's and Full Planning Permission for the construction of 3 no. new additional external windows to the lower ground floor level located at the side (South) and rear (East) of the existing crèche, all to connect to the existing granted waste water treatment system and percolation area all as previously granted under Planning Permission Ref. Nos. 08/142, 09/649, 10/211, 12/268, 15/112 and 19/135 together with all ancillary and associated site works
Works to existing creche comprising the conversion and refurbishment of the existing multi-purpose room at ground floor level to 2 no. pre-school classrooms together with all ancilliary accommodations and all to connect to the existing granted waste water treatment system and percolation area all as previously granted under Planning Permission reference nos. 08/142, 09/649, 10/211, 12/268, 15/112, 19/135 and 19/453 together with all ancillary and associated site works at
The brief summarizes the pattern across all 293 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19848The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief