Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 240 decisions within 5 km, 1 exact-site or onsite candidate record, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kilkenny County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Kilkenny County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Kilkenny County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedNo current-dated citation is loaded for Kilkenny County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For erection of extension to dwelling house and permission for retention of extension to dwelling house and all associated site works
1. Permission for Retention of conversion of first floor storage of existing Montessori playschool to additional childcare accommodation. 2. Permission for Retention of raised wallplate and ridge level. 3. Permission for new prefabricated unit for use as an after schoolers lounge. 4. Permission to upgrade the existing percolation area to accommodate additional loading and all associated site works
For development of a walled silage base, three loose cattle sheds, two roofed feed passages, slatted tank, concrete aprons and associated site works at
To construct underground effluent tank, 2 bay extension to existing round roof shed, leanto to cover tank and feed area, plus all necessary flat concrete
For change of use of existing agricultural building into cider making and storage facility and extension to existing building as a machinery shed and all associated site works
The development will consist of (i) the demolition of 3 no. single storey outbuildings and the demolition of single storey porch to the side (south east facing) elevation of the existing dwelling ('Coislana'). (ii) The construction of a single storey traditional style extension to the rear (south west facing) elevation of the existing two bedroom dwelling, including 8 no. rooflights; provision of attic level roof space; and alterations to all existing elevations. (iii) The construction of a new domestic garage to the south west of the application site. Other works as part of the development include: decommissioning of existing septic tank and installation of new on-site EPA compliant wastewater treatment system to serve the proposed development; landscaping; boundary treatment; and all associated works to facilitate the development.
The brief summarizes the pattern across all 240 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19952The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief